Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
7110 - 210TH ST SW.pdf
w ` J d �w x z t- F- o z ww pE w w Fx- u- C Uu C1 1- z Incorporated August 11 1890 • Sister Cities International — Hekinan, Japan Lu u. -0 (1) d1 =w z F—i d z ; w Lui g ©! C3 N� � F-f = vl Lj-0 z' Uz O~ z IT WAS MOVED BY BOARDMEMBER YOUNG, SECONDED BY BOARDMEMBER BYLSMA, TO APPROVE ADW95-151 AS PRESENTED, INCLUDING THE DESIGN CHANGES OUTLINED BY THE REPRESENTATIVE, AND WITH THE CONTINGENCY THAT THE PENDING APPEAL BE DENIED BY THE SHORELINE HEARINGS BOARD. MOTION CARRIED. ADB-96-125 REQUEST TO REMOVE A MATURE MADRONA TREE Cimmeron Condominiums Thom Peacey 8629 240th Street SW Thom Peacey and Georgia German, residents of 8629 240th Street SW, Edmonds, were present. IT WAS MOVED BY BOARDMEMBER PIERCE, SECONDED BY BOARDMEMBER BYLSMA, TO APPROVE ADB-96-125 AS PRESENTED, WITH THE STIPULATION THAT, WITH THE PERMISSION OF THE CITY OF EDMONDS, THAT AN ADDITIONAL FLOWERING PLUM TREE BE PLANTED IN LINE WITH THE OTHER EXISTING FLOWERING PLUM TREES, AND THAT A REPLACEMENT TREE OF THE HOME OWNER'S CHOICE BE PLANTED IN THE SOUTHEAST PORTION OF THE PROPERTY. MOTION CARRIED. ADB-96-128 NEW COVERED STORAGE BUILDING FOR THE PUBLIC WORKS SITE City of Edmonds Public Works Division 7110 210th Street SW Noel Miller, Superintendent of Public Works, City of Edmonds, was present. IT WAS MOVED BY BOARDMEMBER BYLSMA, SECONDED BY BOARDMEMBER GOODRICK, TO APPROVE ADB-96-128 AS PRESENTED. MOTION CARRIED. PRELIMINARY REVIEW: None. 1. 4122 U-0174 = ANEW."DIA-I'm BOARDMEMBER BYLSMA MOVED, SECONDED BY BOARDMEMBER PIERCE, TO ADJOURN THE MEETING AT 8:00 P.M. MOTION CARRIED. Ar itecuuat Design Board Mating Page 2 Novanber 6,1996 CITY OF EDMONDS BARBARA FAHEY MAYOR 250 6TH AVENUE NORTH • EDMONDS, WA 98020 • (206) 771.0220 • FAX (206) 771.0221 COMMUNITY SERVICES DEPARTMENT Public Works • Planning • Parks and Recreation • Engineering st. 189 MEMORANDUM DATE: October 31;1996 TO: Architectural Design Board Applicants FROM: John Bissell, Associate Planner SUBJECT: Architectural Design Board Agenda and Staff Report Your application is complete and has been scheduled for the November 6, 1996 Architectural Design Board (ADB) Meeting. Enclosed are an agenda and staff report for the ADB meeting of November 6, 1996, Please find your item on the agenda. A representative must be present for each item, including the Consent agenda. The Board often moves items off the Consent agenda and onto the regular agenda. If a representative is not present, the Board will not act on the item. Please note the statement at the top of the agenda. You must obtain sign permits, building permits and any other required permit from the Building Division in addition to obtaining ' approval from the ADB. The review by the ADB is not a substitute for review of building permits, and an approval by the ADB does not -grant construction approval. Please carefully read the staff report pertaining to your item. If you find any errors, missing information or if you have any questions, please call me at 771-0220 before the meeting. It is important that items going to the Board be as complete and clear as possible in order to avoid confusion during the meeting. If the Board does not understand your project, they may; not approve it. • Incorporated August II, 1890 •' Sister Cities International — liekinan, Japan (n W1 U) LU; ul _3 Cn LLI LU 0 ARCHITECTURAL DESIGN BOARD STAFF REPORT October 31, 1996 ADB-96-128 NEW COVERED STORAGE BUILDING FOR THE PUBLIC WORKS SITE A. Applicant/Pr6yerky Owner Architect/Representative Noel Miller City of Edmonds Public Works Division B. Site Location: 7110 210th Street Southwest C. Introduction: The applicant has salvaged an existing covered pole building from another City Site, and is proposing to erect that building on the new Public Works site. The applicant is proposing to re -roof the building to match the existing buildings on site, and to paint the poles of the building to match the color scheme of the other buildings on the site. D. Background: 1. Zoning: The property is zoned General Commercial (CG). 2. Environmental Review: The existing development is not exempt from the State Environmental Policy Act (SEPA) and therefore all subsequent additions are required to comply with SEPA. However, the proposed pole building was considered in the scope of work for the Environmental Determination prepared for the original development. Therefore, the applicant and the City have completed the SEPA review process. 3. Issues: Design of the building, site, and landscaping have all been addressed by the applicant in their proposal, and the Architectural Design Board must determine the appropriateness of the proposal. E. Staff Analysis: 1. Building Design: The applicant is proposing to relocate an existing pole building from another City site to the subject site. The building will be approximately 23 feet tall and will be open on all four sides. The metal roof has a low pitch with a ridge running the length of the building. a) Materials: The applicant has proposed a metal building, with square metal posts and exposed metal rafters. A standing seam metal roof is proposed with seam spacing to match the existing public works buildings on site. rVr r t rt :1 .?"` •;:y �A t r& t s i 3 . t 4 r 4 AL� rw. , 7� s + � is ADB-96-128 b) Lightina The applicant has proposed new sodium vapor lights for, the ".interior :of the proposed building. The applicant states that the light spill should not increase the light Q intensity on the site due tot he existing site lighting. z UJ� � wi c) Colors: a: The posts and rafters will be painted blue. The roof will be painted white to match the existing public works buildings. wi d) Signing: rj No signing is proposed: Wo LU F. . Summary: Staff believes that the Architectural Design Board can find that the Q proposal is supported by the ADB design criteria and the design related policies in U. the Comprehensive' Plan. Therefore, staff recommends the Architectural Design u;I Board approve ADB 96-128 z �-j Z Off, Attachments: LULU 0 1. Vicinity Map 2. Applicant's declarations elevations and site plan T Lwj F- h• u. p _Z ui Ln 0 Z 0- 2 �y i r7�}'tx` l,iw� x 6 i ) z y� � �,��t �`��{i"S^��.+�`,�'ry ri�t i•i �''��k Ffi {4f�� ��' Mk 4{� Ff'{i`� �F� 4�% TH ST SW r�t4 ���d i ' t .Jtit r: .r• �. ` w it f k F rfi h a' r'k"i"`wh ra� v .Vi ?� iT oA 3 3 � ,w NIT i ,:�ti i� TH ST SW n f v re3.t•-, v�y yroS7��. vta.�c if U 212'fH 5T SWi` t °terms �YS �1 tt iti� j i' ris t K1c . ADB-96.1.p5 213TH PL SW y E• s ye z SITE 215TH ST. S.W. t y RM--1.S i Vicinifi7 and Zoning Map t 2 U'' r F u. p: Z Or z EEO Meml-Pa�rdu City of Edmonds Site Pian L No7E•. © Roof C"V. To ATMA f,As- wh woft$ c� iguluN UY. ZOOVS Memt-+Pardue Edmonds PuNio Works Stkogge ouoUng ©$WA -ro OwVA fAi5T,W. VAILD0,16A,�,M Cut j of Edmonds Bull ing 0evattions O Ste Secto 0 o `f..: kt ❑ 32XIE 25X'Q s = Z h— w Q� wV J0 U 0 � w to J r (n LL �0 LLJ =0 }— W zF- r0 F- LU 0 to 0 F_- r LL0 z LU v7 v= or z C •,nNtr ' -Yv PER WHAT SECTION OF THE CODE? T. I *COMMENTS WITHOUT CITATIONS WILL NOT BE CONSIDERED *Additional information Required for Complete Application 4 *Additional Studies Required to Complete Review ; • Owner CITY OF EDMQjyQ$ = PUBLIC WORKS _• Property Address-_ 7110 2 tOTH ST. SW • Date of Application_ I Q/18/96 _ Type COVERED STORAGE BUILDING • Hearing Required:Yes X No Date of Hearing (lf known). X Application Site Plan for Short Subdivision (8.5 x 11} X Fee X ' Site Plan (11 x 17) X APO List Legals (Existing & Proposed) Title Report Environmental Assessment X vicinity Map Proof of 2-Year Occupancy (ADU) . X Elevations ` Declarations (Variance &CUP.} Petition (Official Street Map) X:16v1ionmental,10h6cklisti. Critical Areas Determination 1.. 0 APPLICATION ROUTING FORM `FILE/,,: A0&i96.428. AND CHECKLIST FROW PLANNING''L ROUTED TO: OCT 3 E ingineering 'I PARKS Scr-REAM el ON Fire re.__ - 10/30/96 _ 1 .11 1 F Vr Public Works Public te exaiic Staff Comments: PER WHAT SECTION OF THE CODE? *COMMENTS WITHOUT CITATIONS WILNOT RE E CONSIDERED *Additional Information Required for Complete Application *Additional Studies Required to Complete Review • Owner CITY C PUBLIC --- W-0 RKS • ProperryAddress A Date of Application- 0/18/96 Type COVERED S ORAGE BUILDING • Hearing Required:Yes X No Date of Hearing (if L known X _-Application Site Plan for Short Subdivision (8.5, x1l) X ---Fee X Site Plan (I I x 17) X —APO List ._�egals (Existing & Proposed) Title Report Environmental Assessment X Vicinity Map Yroof of 2-Year Occupancy, (ADU) X Elevations Declarations dance & C. U• Pefifion (Official Street Map) , Environmental I viron L: �, XMantel, Checklist - - - - - - - - - L Critical Areas Determination 77 z Z UJ _j U 00 U) U) LU LU Ln LL 0 LU Cc Ji LL LJJ z F_ � 0 z LU Uj g U en LU L'U 0 z LU W L) 0 z APPLICATION, ROUTING FORM FILE::, ADS-.9&1,28 AND CHECKLIST FROM:":,"PLANNING /91 41941 ROUTED TO: *OIRKS UEPI RETURNED.4t, 4 Engineering 10/3 19A Enidn6erine */A f a Firg, 1-0130/96 Fire -1 .40. 1 Public Worki, _!W3a/9 Parks a Rec. Staff Comments: - *PER WHAT SECTION OF THE CODE? *COMMENTS WITHOUT CITATIONS WILL NOT BE CONSIDERED *Additional Information Required for Complete Application *Additional Studies Required to Complete Review • Owner CITY OF EDMONDS - PUBLIC WORKS • Property Address 7110 21 OTH ST. SW i Date of Application 10/18/96 • Type.- COVERED STORAGE BUILDING • Hearing Required:Yes—X_ No Date of Hearing (If known) X —Application Site Plankr Short Subdivision (8.5 x 11) X —Fee Z_LSite Plan (111 x 17) X —APO List Legals(Existing & Proposed) Title Report jnvironmental Assessment X _Yicinity Map �_�Proof of 2-Year Occupancy (Aw) X Elevations a - D.clarafions(Variance&C.'U.,P Petition (Official Street Map) _.L_Environmentat Checklist Critical Areas Determination, 0 0 ( rZ F— w W0 JV U 0 Y)o w w �H Loo w CC J LL = , �w z I— t— 0 ww U u). 0 LL0 z w� 0 z r- 0 L0 ROUTED TO: RETURNED:- ' I 'NOV- 011996 Engineering 10/30146 Engineering w.Rn nr►7 r irirex _ Fire Public Works 10130n6 Public Wo Parks 8t Rec. 10/30/96 " Parks"& Rec. Staff Comments:i1Dl'9U<.� *PER WHAT SECTION OF THE CODE? `y ,9 *COMMENTS WITHOUT CITATIONS WILT. NOT BE CONN 6' *Additional Information Required for Complete Application T *Additional Studies Required to Complete Review • Owner CITY OF EDMONDS - PUBLIC WORKS • Property Address 7110 21 OTH ST. SW • Date of Application 10/ 18/96 • Type COVERED STORAGE BUILDING • Hearing Required:Yes X No Date of Hearing (if `known) X Application ---____,Site Plan for Short Subdivision (8.5 x 11) X Fee _-X-Ste Plan (11 x 17) . X APO List : Legals (Existing &Proposed),' Title Report Environmental Assessment X Vicinity Map Proaf of 2-Year Occupancy (ADU) X Elevations Declarations Petition (Official Street Map) X Enwronmental Checklist Critical Areas Determination z =z H w Q = w U �Q L0 W wx J F- Lo W d` =W zh �O ww �O �n U en O H W w' = c� tiF- LLO �z ui cn U T O~ z z C APPLICATION ROUTING FORM FILE AD13-96=128 AND CHECKLIST FROM PLANNING ROUTED T0: RETURNED Engineering 10130/96 Engineering Fire 10130/96 Fire Public Works 10/30/96 Public Works Parks 81 Rec. 10/30/96 Parks :& Rec. Staff Comments: *PER WHAT SECTION OF THE CODED *COMMENTS WITHOUT CITATIONS WILL NOT BE -CONSIDERED *Additional Information Required for Complete Application *Additional Studies Required to Complete Review • Owner. CITY OF EDMONDS -PUBLIC WORKS PropertyAddress ___71 10.210TH ST. SW • Date of Application 10/18/96 _ Type COVERED STORAGE BUILDING • Hearing Required:Yes__x___ No Date of Hearing (if known) r X Application Site Plan for Short Subdivision (8.5 x 11) X Fee X Site Plan (11 x 17) X APO List Legals (Existing & Proposed) i Title Report Environmental Assessment 1 X Vicinity Map Proof of 2-Year,Occupancy (ADU) X Elevations Declarations (Variance & C. U. P.) Petition (Official Street Map) X' Env ironmentaiChecklist Critical Areas Determination ® ARCHITECTURAL DESIGN BOARD C] COMP PLAN AMENDMENT ❑ CONDITIONAL USE PERMIT FILE # `A05- (44 -129 ZONE ` ❑ HOME OCCUPATION ❑ FORMAL SUBDIVISION DATE /v 1,q Iq 6 REC'D BY ❑ SHORT SUBDIVISION FEE RECEIPT# ❑ LOT LINE ADJUSTMENT ❑ PLANNED RESIDENTIAL DEVELOPMENT HEARING DATE ❑ OFFICIAL STREET MAP AMENDMENT! STREET VACATION ❑ HE ❑ STAFF ❑ PB TDB ❑ CC El REZONE ❑ SHORELINE PERMIT ACTION TAKEN: ❑ VARIANCE / REASONABLE USE EXCEPTION ❑ APPROVED ❑ DENIED ❑ APPEALED ❑ OTHER APPEAL# Applicant City- of Edmonds - Public Works Division Phone 771-0235 Address 7110 - 210th St. SW - Edmonds. WA 98026 Property Address or Location Same Property Owner. City of Edmonds - Public Works Phone 771-0235 Address 7110_- 210th St. SW - Edmonds, WA 98026 Agent Noel Miller Phone 771-0234 Address 7110 - 210th St. SW Edmonds, WA 98026 T,ax Acc.# Sec. Twp. Rng. Legal Description Lots 6, 7, 8, 9, and 10, Block 6, Plat of Seattle Heights, Division #4, Volume 9, of plats, page 11, Records of Snohomish County. Details of Project or Proposed Use Erect a covered storage building in conjunction with the new Public Works Operations and Maintenance Center. The undersigned applicant, and his/ her/ its heirs, and assigns, in consideration of the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or in part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/ her/ its agents or employees. The undersigned applicant grants his/ her/ its permission for public officials and the staff of the City of Edmonds to enter the subject property for the purpose of inspection and posting attendant to this application. SIGNATURE OF APPLICANT/ OWNER/ AGENT �t r Z LLJ LU -i L) 0 (1) 0 a) LU Lu -j cn LL 0 LU LL ci LL, 3: Z F- � 0 z �- uj LU U 0 LU Uj LL- 0 z LU or z t r r t p :,. .. �.........�.-..� .. ate....... .. «.. .. �. � : f t- cwl cr.Gt 3 U3 �� Date: October 14,1996 v 01 u, u,1 To: Jeff Wilson Planning Supervisor w O • From: Noel Mille �,-----'-' � Q Public Works S erintendent T)o N x Subject: Public Works Covered Storage Building Project z i-! Z �` Public Works is planning to erect the covered storage building salvaged from the primary Is UJa; wastewater treatment plant. We will be submitting the building design to the ADB later Nj this month. As part of the submittal, a SEPA checklist needs to be included for building r a development over 4,000 square feet in size. In March 1993, a SEPA checklist was prepared for the Public Works Operations and — z� Maintenance Center site. The covered storage building was shown as part of this project u; (3 at that time. It was intended to erect the covered storage building after the major portion o �. of the center was completed. z This memo is to inform you that the SEPA process has already been completed for the Public Works covered storage building. Please let me know if you need any further information. --� NMllk 0 cc: John Bissell, ADB Planner E® r t wordata\pwomc\storbldg �y f City of Edmonds cQ Public Works M-HY��y5�% �.Y) MEG 0 Edmonds PubHo Works Storage ouuldung �a City of Edmonds o �3 Ske plan '32- IL O it® C> _ 25 P i O p ' tyoTE' © Roof Casa. TO MM A £XtSTtwn ?UBcK WORKS . $Lt1WlNfi. '�gpt5 M�+ rdwParawPa Edmonds PubHe Works StoLage ufldon�g ©�,� � �ast�t �tsr1� �ILOtN6, MtM � a� My of Edmonds BuiUng-4fflevagona Ske SeWon ' ,w - PLba@.at a UCPT. I. SM a I wo -t A /.vpn uolii i .'i w•n_. .... o M. I LL� I g 1 c yl c pgi i t. WT«nT wn E CITY OF FDMONP C I 1' IH C—U, 1 A1:1