Loading...
712 6TH AVE N.PDF111111111111 5369 712 6TH AVE N City of Edmonds Critical Areas Checklist The Critical Areas Checklist contained on this form is to be,filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Cihcddist should be easily available from observations of the site or data available at City Hall (Oitical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the cheddist, sign and date it, and submit it to the City. The City will review the checldist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development Permit application. With a signed copy of this form, the applicant should also submit a vicinity map of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant is encouraged to include any other pertinent information or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided -are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: /P161 ('�N MAyLL Name M tS i ciz Title `_7( 2- -fLr ,q_V ju Street Address E� IUI 0 Cit1111, tate, IP Phone 23 Signature Date Applicant Representative: Name Title Street Address City, State, ZIP Signature Phone Date ST13EET FILE Critical Areas Checklist' : Site Information Project Name: Permit Number. Site Location: ] 12- (, *k v tj . Property Tax Account Number. Q- 3 C S o 0 0 0 1 1 o O O g' Approximate Site Size (acres or square feet): • C �> C Have you filled out a Critical Areas Checklist for a project on this site before? C) General Site Conditions 1. Has the site been cleared or logged? �� Date of most recent actiony �' Soils / Topography &, a� 2. In the Snohomish County Soil Survey, what is the.mapped soil type(s)?-d'�►+� 3. Describe the general site topography. Check all that apply. Flat: less than 5 feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a horizontal distance of 66 feet.) Hilly: slopes present on site of more than 15% and less than 301/,p ( a vertical rise of 10 feet of horizontal distance.) Steep: grades of greater than 30% present on site. Comments Hydrology/Vegetatiort 4. Site contains areas of year-round standing water: ti% 5. Site contains areas of seasonal standing water. IV) el Approx. Depth: 6. Site is in the floodway — floodplain — of a water course_ 7. Site contains a creek or an area where water flows across the grounds surface? N C flows are year-round? Flows are seasonal? 8. Site is primarily: forested : meadow ; shrubs ; mixed \;o 9. Obvious wetland is present on site: ti U WAIVER Critical areas -study not required Determinati6n :Number. ( - '" Reviewer Pldnner Date. Rev 3/27/92 STREET FILE CITY OF EDMONDS 200 DAYTON ST. • EDMONDS, WASHINGTON 98020 • (206) 775-2525 DEPARTMENT OF PUBLIC WORKS December 3, 1980 Mr. George Morgan 712 _6thNAvenue_ North Edmonds, Washington 98020 Dear Mr. Morgan: HARVE H. HARRISON MAYOR The City.of Edmonds is currently engaging in a program to improve its sewage wastewater treatment system. One of the major parts of the program is reducing the volume of flow into our Treatment Plant. A major item contributing to this problem is the infiltration of stormwater runoff from roofs, drains, etc. into our sanitaty sewers. A series of tests were completed by an independent engi- neeririg'firm. They pumped smoke into sewerlines and recorded where it was escaping, thereby locating the stormwater infil- tration sources. Your property contains such a source and the City now requires, by Ordinance No. 1580, that this problem be corrected. Included with this letter is the "Disconnect Handbook" which describes 5 possible solutions to this problem as suggested by the City. These solutions will either direct storm water into the City,storm water system, or into other parts of your yard. In either case, the removal of this water from sanitary sewer system will help to reduce the volume of our often overtaxed Sewage Treatment Plant. Please contact Dan Smith or Bob Franklin at 775-2525, extensions 220 or 252 when you have "disconnected". Your cooperation will be greatly appreciated. I Sincerely, k,�,S ADAMS, P.E. CIyEngineer DS : j ky Enclosure APPLICATION for The City of Edmonds SIDE SEWER PERMIT EASEMENT No ........................................... NEW CONSTRUCTION p REPAIRS 114-o88o0 OWNER ........... Gry-a.....BLll'1_Ce.....................................................................•---. CONTRACTOR .. PERMIT No.... ADDRESS........ 7--2--- 6th... Ave ...... N-................................................... • M • LEGAL DESCRIPTION: LOT No ............................................... BLOCK No............................................. NAMEOF ADDITION---.....----•-•-•................................................................ Dye Tested On Sewer 1972 Approved: DATE................................................ By......-----.............----.........-................................