7121 210TH ST SW Street File.pdfiiiiii iiiiii
2674
7121 210TH ST SW
CITY OF EDMONDS
PUBLIC WORKS DEPARI&NT FOR INSPECTION CALLID permit N? _ _ 6678
SIDE SEWER PERMIT 775-2525 Ext. 220 Issue Date 6
* PERMIT MUST BE POSTED ON JOB SITE
1. Address of Construction % ,�/D �h/. C/irTor� �s �it;
2. Property Legal Description (include all easements)
3. Single Family Residence Multi -Family No. of Units
Commercial
4. Owner and/or Builder
a S AI 6 1/l
-6�? ---? 7
5. Contractor & License No.
6. Invasion into City Right -of -Way: Noj,,- Yes (If Yes Right-of-
way Construction Permit Required - Call Dial Dig (342-5344) before
excavation).
7. Cross other private property: Yes No�j Easement required -
v attach legal description and county easement number.
H
a READ THE FOLLOWING AND SIGN:
a. Property owners must obtain a permit to install 'side sewers on
>4 their property. A licensed side sewer contractor must be employed to
construct side sewers in the public right-of-way.
w b. The side sewer contractor assumes full reponsibility for each
H installation for one year.
wc. Commercial establishment requires a minimum of a QAUL AI10Uk6
� side sewer line. B�F p4� �� (Q�6)
v d. Side sewers may not be installed closer than thi c
to any structure. j . 00 _ 5 P!5
e. Side sewer lines mustbe laid at a minimum grade. of 2% f
o and maximum grade of 100% (450). o
H f. No turn in side sewer greater than 45 (1/8 bend) is0allowed
between cleanout. All 90 turns must be constructed of a 45 (1/8
bend) and wye with removable cap.
g. No down spouts, footing drains or floor drains can be connected
to side sewer system.
h. Pea gravel is required for bedding when installing sewer lines
through other than granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 100' along sewer line run.
j. Trenches within City right-of-way must be restored to original
conditions. Contractors shall be responsible for right-of-way failure
due to poor compaction of fill.
k.. Side sewer must be.left uncovered until inspected and approved
by the City.
1. Inspection during normal working ho rs only. Two (2) working
days noti a required. RC91Vb
DATE: b O
APR 81981 I certify that I have r ad
and shall comply with the above
U W
w
PERMIT FEE:
CONNECTION FEE:
T -V �,r .�s
DISAPPROVED By: Date:
By: Date:
APPROVED By: Date:
T
T BE POSTED ON JOB SITE *
CITY OF EDMONDS
FOR INSPECTION CALL
PUBLIC WORKS DEPARTMENT Permit
4
SIDE SEWER PERMIT 775-2525 Ext. 220 Issue Date `F d
PERMIT MUST BE POSTED ON JOB SITE
1. Address of Construction �✓ l ,�,'� -'�� j� �'' ',✓! !> ,,fin �;�`:a�
2. Property Legal Description (include all easements)
VIA BALLINGER 1
3. Single Family Residence Multi -Family ,�f�
i(-11 L� e�
Commercial J
4. Owner and/or Builder / `j�?s,^,�o % Ale. %z•/
5. Contractor & License No.
6. Invasion into City Right -of -Way: No � Yes (If Yes Right -of- I
way Construction Permit Required - Call Dial Dig (342-5344) before 1
excavation). 1
7. Cross other, private property: Yes No )j5�" Easement required -
u attach legal description and county easement number. 1
a READ THE FOLLOWING AND SIGN: 1
a. Property owners must obtain a permit to install side sewers on 1
>4 their property. A licensed side sewer contractor must be employed to
construct side sewers in the public right-of-way. 1
w b. The side sewer contractor assumes full reponsibility for each 1
H installation for one year. uu `�
aC. Commercial establishment requires a minimum of SALL �QQ �i(MOVA'S 1
z side sewer line. R kx9v ���) 1
o d. Side sewers may not be installed closer than th
to any structure. 1- 00 - 562-6418 1
e. Side sewer lines must be laid at a minimum grade of 2% (1.15 ) 1
O and maximum grade of 100% (450). 0 1
H f. No turn in side sewer greater than 45 (1/8-bend) is0allowed
between cleanout. All 90 turns must be constructed of a 45 (1/8
bend) and Wye with removable cap. 1
g. No down spouts, footing drains or floor drains can be connected
to side sewer system. 1
h. Pea gravel is required for bedding when installing sewer lines
through other than granular soil. 1
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 100' along sewer line run.
j. Trenches within City right-of-way must be restored to original 1
conditions. Contractors shall be responsible for right-of-way failure
due to poor compaction of fill. 1
k.. Side sewer must be left uncovered until inspected and approved 1
by the City.
1. Inspection during normal working hours only. Two (2) working
days notice required. `_ 1
DATE: C� �� AAA.
AA.
I certify that I have read 1
and shall comply with the above
r. PERMIT FEE:, DISAPPROVED By: Date:
U W By: Date:
CONNECTION FEE: APPROVED By Date:
O
* PERMIT MUST BE POSTED ON JOB SITE
t
Side Sewer Drawing
The City of Edmonds EASEMENT
T NO . .....................................
NEW CONSTRUCTION REPAIRS n LID NO. .... ASMT. NO. ................
OWNER ... .............................................................. CONTRACTOR ... ................ ............................. PERMIT NO.
JOB ADDRESS ..... .......... LEGAL DESCRIPTION: LOT NO ....................................... BLOCK NO. ....................................
.................................. ......................................................................................... .. VI'A"IBAMINGElt-
NAME OF ADDITION .............................. LIFT STATION
7 --------------------------- * ---------- * --------- ---- -----------------------------
Approved:
�\
PWW-0001-11/75(REV.11/78) DATE .... 9 ... ............ By ------