August 16, 2007
MEMO TO:
Edmonds School District
Verizon Northwest
SNOCOM Police and Fire Dispatch
SNOPAC
Snohomish County E911
U.S. Post Office
Snohomish County Assessor's Office
Snohomish County Information Services
Snohomish County P.U.D.
Puget Sound Energy
Edmonds Fire Department
Edmonds Police Department
Edmonds Utility Billing
Edmonds Public Works
Edmonds Building/Street File
Edmonds Address Files
Lynnwood Disposal
Comcast Cable
Waste Management Northwest
GARY HAAKENSON
MAYOR
Please be advised that the attached address has been added to the Edmonds address
System:
8344 Olympic View Dr. (Lot B) and 8354 Olympic View Dr (Lot A)
Previously one parcel split to three addressed 8364 Olympic View Dr (Lot C) on which
original house will remain.
Occupancy: R3
Tax ID Number: 27041800101000
If you have any questions regarding this letter, please contact a permit coordinator at
425-771.-0220. Please contact us if you wish to be removed from this list.
Respectfully,
Permit Coordinator
Edmonds Building Department
Cc: William Ritter
8364 Olympic View Dr
Edmonds, WA 98026
L\Temp\DST's\Master Letters\New Address8/16/2007
• Incorporated August 11, 1890 •
Sister Citv - Hekinan. Japan
s •. �
18601
18603 18604 18603 18602 ,8605 lesoa 18604 ..
18606
18615 18612 18607
1e613 tads lefill 18614 18614
18625 18622 1R619 18609 18605 3
rn 11i ,esz7 testa � 1e621 1e622 '�
18627 18624
a18627 18630 a U. a
18631 18632 x 18629 18630 x +
3
fL
Q
f-:
�I w.rILA 1 nay r j ( 179
County Park
�� 18007
T180 _ 8370 18013 'd' -� 8011 a
8005
Q Z+ u 0 7922 7914
18017 18009 'go" \ 180091 m o yl
VV J 10"1 18000 m
1807H'PL Taos p I'
18017 y�
m 1so11
s m 18014 18 2 o m m N m
m o , BR25 7804
18028
18106 18104
m m
N N 1J N
0� � io m � 1910i
1s1o1 Ie,o3 QD?a 18104
g 16 18114 ".181STPL,181ST PL SW.
: ezol ,ens ",en7 .2 7 16111 15",
." �J
!- 4A
13107 18105 18,20 tells ?$ m_ o m 7925 7919 7913 1 O 18715 1yy0/�
'.? 18118 7921 1
tells 18125 1 /
i 18220O R211 0 1 silo t8ND'' 18203 0
,Rn1 lezze az m �° Rill �877� j ,B \ m f3 18205 18201 i
18208 m }}III 182zz 182NO:PL at
18232 8203 102I3
8115 18218 10 �o� 10216 - ¢ 16209 18211
18311 18224 18236 7
18227 16223 18219
18226
8117 7810
19300
.�W 18321 16302 18304 18312 18326 18305 0 0 0 o s 1 \
18306 W.. _ W _ 7704 Zp
m i S
t 16303 Q 18 Q'-
40.
a m
8133 N �• /
m o m m 1O 81i1
soot 1e325 lRaoa
—I: 184TH ST SW
^ .
6' Post 76a5
7ea7s
i N Seaview 18415 Office 7607 a's'TM'
x e312 N m IR41R �—
? m � 1ebt9 7601 7533y
k' ,R426
Tolle
Par
g e31a 18427
' 16a32 Ma et L
1 1
le503 1aso4 Iesos I 18504 ,65° i f
m ...N 1s508
W W m N k1
LL42
18514 '18515 18514 :Q m $leslz .S185THPlSW 7eoe eslo Q�O18516 7620
CL
18526 m 18527 8209 ;.m. B�2 18530 18525 { 4
- - - n 7805 16596 7526 �
1ssTH sr
_i
` mm �Ny �yy �ONy N N O
1871�ST.SW
r r ► ,es33 1
..g m. 1a70t 1e704 0? 1' .m. ,eno
N < $ m m o o o e ,e7os 1e7os 18703 18702
m 18703 18714 78707
7925 18714 18715 16714 18720
,e715 18718
187TH 18719 •„
N ^ o m N H N N No _18717 i
m$ m m m m Nm m m m m 6029 18728 o ii
7 8730
188TH ST SW
N S 8302 ", ""- x. <....,,,< 18807 !
e123 leelo ,RRo7
18807 8016 18808 1R801 m N ,.., ..� : <,...... ,
� 18810 m � o 0 7Bi m. 1d815
¢ 18818 18813 18816 1B811 7812 7804 18836 18811 tRR14
718823 n ^ �; 188153
18823 18e24 1�2,
n IsB19
18823 18824 ,>
18822 - 18829 m $ 10� 18824 29 10822 Q 1RR231 .
£18901 :W1883018829
' 18831 188323 18829 18832 m '9pJ uj.30Z3 18832 1� 10823 �'
1a9n5 18908 _'ra. Q.. f- 3 1ggp3 18905 ^ ..
VA4
STREET FIDE
GEOTECHNICAL ENGINEERING STUDY
PROPOSED 3-LOT SHORT PLAT
8364 OLYMPIC VIEW DRIVE
EDMONDS, WASHINGTON
L&A Job No. 5A 112
Date: September 26, 2005
Prepared for:
Mr. Bill Ritter
8364 Olympic View Drive
Edmonds, WA 98026
Prepared By:
Liu & Associates, Inc.
19213 Kenlake Place NE
Kenmore, Washington 98028
.Attachment 5-
LIU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth Science
September 26, 2005
Mr. Bill Ritter
8364 Olympic View Drive
Edmonds, WA 98026
Dear Mr. Ritter:
Subject: Geotechnical Engineering Study
Proposed 3-Lot Short Plat
8364 Olympic View Drive
Edmonds, Washington
L&A Job No. 5A1 12
INTRODUCTION
We have completed a geotechnical engineering study for the subject plat site, located at the
above address in Edmonds, Washington. The general location of the project site is shown on
Plate 1 — Vicinity Map. We understand that the proposed development for the site is to plat it
into three single-family residential building lots. The purpose of this study is to characterize the
subsurface conditions of the site and provide geotechnical recommendations for grading, slope
stabilization, erosion mitigation, surface and ground water drainage control, foundation design
and construction, etc., for the proposed development. Presented in this report are our findings
and recommendations.
PROJECT DESCRIPTION
For our use in this study, we were provided with an undated plat plan of the proposed
development for the site. According to this plan, the proposed development for the site is to plat
it into three single-family residential lots. The existing house on the new Southern Lot will
remain, and a new residence will be constructed on each of the two remaining new lots (the
Northeast and Northwest lots). The Northeast and Northwest Lots are on a moderate to steep
19213 Kenlake Place NE - Kenmore, Washington 98028
Phone (425) 483-9134 - Fax (425) 486-2746
T
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 2
hillside. Although design plans for the new residences to be constructed on these lots are not vet
available, we anticipate the buildings will be wood -framed structures supported on concrete -
walled basement and interior bearing walls, columns and footing foundations. The footprint
excavation for these buildings will probably require cuts from a couple to 15 feet deep and
possibly less significant fill.
SCOPE OF SERVICES
Our scope of services for this study comprises specifically the following:
I Review the geologic and soil conditions at the site based on a published geologic map.
2. Explore the site for subsurface conditions with backhoe test pits to a firm bearing soil
stratum or to the maximum depth (about 12 feet) capable by the backhoe used for
excavating the test pits, whichever occurs first.
3. Perform necessary geotechnical analyses, and provide geotechnical recommendations for
site grading, erosion abatement, slope stabilization, surface and ground water control, and
foundation design and construction, based on subsurface conditions encountered in the
test pits and results of our geotechnical analyses.
4. Prepare a written report to present our findings, conclusions, and recommendations.
SITE CONDITIONS
SURFACE CONDITIONS
The site is an irregularly -shaped tract of land. It is bounded by Olympic View Drive and an
undeveloped city park land to the north, and adjoined by residential developments to the south,
east and west. The site is situated on the mid -slope of a broad, moderate to steep, northwesterly -
declining hillside. The southern portion of the site where the new South Lot is located has been
previously graded into a relatively level bench. The terrain within the new Northeast and
LIU & ASSOCIATES, INC.
'I1 i .
September 26, 2005
.Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 3
Northwest Lots of the site generally slopes down northerly to northwesterly at about 15 to 83
percent grade. The steeper portions are mostly along the south sides of these two lots and the
eastern half of the Northwest lot.
The existing residence on the South Lot is accessed by a paved driveway along the east side of
the site. The unpaved area around this existing residence is mostly landscaped with shrubs. The
area of the Northeast and Northwest Lots is heavily wooded, dotted by tall, mature evergreen and
deciduous trees and covered by dense underbrush.
GEOLOGIC SETTING
The Geologic Map of the Eastern Flalf and Part of the Western Half Quadrangles, Washington,
by James P. Minard, published by U. S. Geological Survey in 1983, was referenced for the
geologic and soil conditions of the lot. According to this publication, the surficial soil units at
and in the vicinity of the lot are mapped as Vashon Till (Qvt) underlain by Advance Outwash
(Qva)-
The geology of the Puget Sound Lowland has been modified by the advance and retreat of
several glaciers in the past and subsequent deposits and erosion. The latest glacier advanced to
the Puget Sound Lowland is referred to as the Vashon Stade of the Fraser Glaciation, which has
occurred during the later stages of the Pleistocene Epoch and retreated from the region some
14,500 years ago.
The Vashon till soil unit is a very dense mixture of unsorted clay, silt, sand, gravel, and scattered
cobbles and boulders, often referred to as "hard pan". The Vashon till over the tep two to four
feet is normally weathered to a medium -dense state, and is moderately permeable and
compressible. The underlying fresh till is very dense and practically impervious to stormwater
LIU & ASSOCIATES, INC.
f 1
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 4
infiltration. The Vashon till soil unit, however, was not encountered by the test pits excavated on
the site.
The advance outwash soil unit underlying the Vashon till is composed of stratified sand and
gravel with minor amounts of silt and clay, deposited by the meltwater of advancing glacial ice.
Due to its generally granular composition, the advance outwash is of moderate permeability and
generally drains well. The advance outwash is glacially overridden and is generally dense to very
dense in its natural, undisturbed state, except the top 3 to 5 feet where exposed on slopes which
may be eroded and weathered to a loose to medium -dense state. The advance outwash deposits
can stand in steep cuts or natural slopes for extended period of time when undisturbed. Where
exposed on slopes of poor vegetation cover and subjected to storm runoff, the advance outwash
deposits can be gradually eroded and may slough to a flatter inclination. The advance outwash
deposits in their native, undisturbed state can provide very good foundation support with little
settlement expected for light to moderate residential structures.
SOIL CONDITIONS
Subsurface conditions of the subject site were explored on September 6, 2005, with six test pits.
The test pits were excavated with a track -mounted backhoe to depths from 8.0 to 10.0 feet. The
approximate locations of the test pits are shown on Plate 2 - Site and Exploration Location Plan.
The test pits were located with either a tape measure or by visual reference to existing
topographic features in the field and on the topographic survey map, and their locations should be
considered only accurate to the measuring method used.
A geotechnical engineer from our office was present during subsurface exploration, who
examined the soil and geologic conditions encountered and completed the logs of test pits. Soil
samples obtained from each soil unit in the test pits were visually classified in general
LIU & ASSOCIATES, INC.
I 1
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 5
accordance with United Soil Classification System, a copy of which is presented on Plate 3.
Detailed descriptions of soil units encountered during site exploration are presented in the test pit
logs on Plates 4 through 6.
The test pits revealed that the site is mantled by a layer of loose, organic topsoil, from 0.8 to 2.7
feet thick. The topsoil is underlain by a layer of weathered soils of light -brown, loose to
medium -dense, silty fine sand with a trace of gravel, from 1.6 to 3.5 feet thick. Underlying this
layer of weathered soils is a brown -gray to light -brown to light -gray advance outwash deposit of
medium -dense, gravelly, clean to slightly silty, fine to medium sand with occasional cobble, from
1.8 to 3.2 feet thick. This medium -dense advance outwash deposit is underlain to the depths
explored by a light -gray advance outwash deposit of dense, gravelly, tine to coarse sand.
GROUNDWATER CONDITION
Groundwater was not encountered in any of the test pits. The advance outwash deposits
underlying the site are of moderately high permeability, and would allow stormwater to seep
through. Stormwater infiltrating into the advance outwash deposits would perch and accumulate
over an underlying impervious silt and clay layer at greater depth. We expect little impact on the
proposed development by this deeper groundwater.
DISCUSSION AND RECOMMENDATIONS
GENERAL
Based on the soil conditions encountered in our subsurface explorations, it is our opinion that the
site is suitable for the proposed development from the geotechnical engineering viewpoint,
provided that the recommendations in this report are fully implemented and observed during
construction. The topsoil, loose weathered soils and soils in the root zone should be completely
stripped within the driveways, the building pads and where the subgrade soils are to support
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 34.ot Short Plat
L&A Job No. 5A 112
Page 6
structural or traffic load. The medium -dense to dense advance outwash soils are of fair to
moderately high shear strength and can provide good foundation support to the driveways and the
new buildings to constructed on the site.
Conventional footing foundations placed on or into the. underlying medium -dense to dense
advance outwash soils may be used for supporting the new buildings to be constructed on the
site. Structural fill, if required for site grading, should be constructed over the underlying
medium -dense to dense advance outwash soils following the stripping of surficial unsuitable
soils.
GRADING SEASON
Due to the sensitive nature of the steep slopes within the site, we recommend that grading and
foundation construction work for the residence be carried out and completed in the dryer period
from April 1 to October 30 of.the year. The site should be stabilized with proper drainage and
erosion control measures in place beyond this dry season grading period.
GEOLOGIC HAZARDS AND REMEDIATION
Landslide Hazards
The subject site is underlain at shallow depth by medium -dense to dense advance_ outwash soils
of fair to moderately -high shear strength. The advance outwash deposits are quite permeable,
and the impervious silty soils normally underlying the advance outwash soil unit is not exposed
within the site. Therefore, seepage of groundwater out of slopes from the interface of the
advance outwash deposits and the underlying silty soil unit should not occur within the site. The
competent advance outwash soils underlying the site and little potential of groundwater seepage
within the site would make it unlikely for deep-seated landslide to occur within the site.
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 34.ot Short Plat
L&A Job No. 5A 112
Page 7
Erosion Hazard
The surficial topsoil and loose weathered soils over the steeper portion of the site can be easily
eroded when stripped of vegetation cover and overly saturated. Prolonged erosion can lead to
soil sloughing and shallow, skin -type mudflows on the steeper portion of the site. To mitigate
erosion potential, the vegetation cover outside of construction limits should not be disturbed.
Concentrated stormwater should not be discharged onto the ground anywhere within the site.
Spoil soils and yardwaste should not be disposed of within the site. Storm runoff over
impervious surfaces, such as roofs and paved driveways, should be captured with underground
drain line systems tied to roof downspouts and by catch basins installed in driveways, and should
be tightlined to discharge collected water into a storm sewer or a suitable stormwater disposal
facility. Unpaved, disturbed ground within the site should be re -vegetated as soon as possible to,
provide erosion protection. Once the drainage control measures for the roadway and houses are
in place after the completion of the proposed development, the amount of surface runoff and
near -surface groundwater flow will be reduced, which would further reduce soil erosion and
enhance site stability.
Seismic Hazard
The Puget Sound region is in an active seismic zone. The lot is underlain by medium -dense to
dense advance outwash soils of fair to moderately high shear strength. There is a lack of
continuous, extensive, static groundwater table at shallow depth under the lot. Therefore the
potential for seismic hazards, such as deep-seated landslides, liquefaction, lateral soil spreading,
to occur on the site should be minimal. The.proposed building, however, should be designed for
seismic forces induced by strong earthquakes. Based on the soil conditions encountered by the
test pits, it is our opinion that Seismic Use Group I and Site Class D should be used in the
seismic design of the proposed residences in accordance with the 2003 international Building
Code (IBC).
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A1 12
Page 8
SITE PREPARATION AND GENERAL GRADING
Site preparation for the proposed development should include clearing and grubbing within
construction limits. Topsoil, loose weathered soils, and unsuitable soils in the root zone should
be completely stripped within the driveways, the building pads of the proposed buildings and in
other areas subject to traffic and structural loads. The exposed soils should be compacted to a
non -yielding state with a vibratory compactor and proof -rolled with a piece of heavy earthwork
equipment operated on the site.
The on -site soils contain a high percentage of fines and are sensitive to moisture. A layer of
clean quarry spalls should be placed over excavated areas and areas of frequent traffic, as
required, to protect the subgrade soils from disturbance by construction traffic. Silt fences
should be erected along the downslope boundaries of the site to prevent sediments being
transported by storm runoff onto adjoining properties or the street. The bottom edge of the silt
fence should be embedded in a trench and ballasted with crushed rock or gravel.
EXCAVATION AND FILL SLOPES
Under no circumstance should excavation slopes be steeper than the limits specified by local,
state and federal safety regulations if workers have to perform construction work in excavated
areas. Unsupported temporary cuts greater than 4 feet in height should be no steeper than i-
1/4HA V in the surficial topsoil and loose weathered soils, and no steeper than I H:l V in the
underlying medium -dense to dense advance outwash soils. Permanent cuts should be no steeper
than 21/2H:1 V in the surficial topsoil and loose weathered'soils, and no steeper than 2H:1 V in
the underlying medium -dense to dense advance outwash soils. The soil units and the stability of
cut slopes should be observed and verified by a geotechnical engineer during excavation.
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 9
Permanent fill embankments required to support structural or traffic loads should be constructed
with compacted structural fill placed over proof -rolled, undisturbed, medium -dense to dense
advance outwash soils after the unsuitable surficial soils are stripped. Permanent fill to be placed
on slopes steeper than 20 percent grade should be retained structurally. Sloping ground
exceeding 15 percent grade over which fill is to be placed should be benched with vertical steps
no more than 4 feet high after stripping of unsuitable surficial soils. The slope of permanent fill
embankments should be no steeper than 2H: I V. Upon completion, the sloping face of permanent
fill embankments should be thoroughly compacted to a non -yielding state with a hoe -pack.
The above recommended cut and fill slopes are under the assumption that groundwater seepage
will not be encountered during construction. If encountered, the construction work should be
immediately halted and the slope stability re-evaluated. The slopes may have to be flattened and
other measures taken to stabilize the slopes. Storm runoff should not be allowed to flow
uncontrolled over the top of cut or till slopes. Permanent cut slopes or fill embankments should
be seeded and vegetated as soon as possible for erosion protection and long-term stability, and
should be covered with clear plastic sheets, as required, to protect them from erosion by
stormwater until the vegetation is fully established.
STRUCTURAL FILL
Structural fill is the fill that supports structural or traffic load. Structural fill should consist of
clean soils free of organic and other deleterious substances and with particles not larger than four
inches. Structural fill should have a moisture content within one percent of its optimum moisture
content at the time of placement. The optimum moisture content is the water content in the soils
that enable the soils to be compacted to the highest dry density for a given compaction effort.
LIU & ASSOCIATES., INC.
September26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 1 l 2
Page 10
The on -site advance outwash soils contain a high percentage of fines, and may be used as
structural fill only under fair weather condition when their moisture content can be controlled to
close to optimum moisture content. Imported material for structural fill should be clean, free -
draining, granular soils containing no more than 5% by weight finer than the No. 200 sieve based
on the fraction of the material passing No. 4 sieve, and should have individual particles not larger
than four inches. Imported structural fill should be stockpiled and covered separately from the
on -site soils.
Structural fill should be placed in lifts no more, than 10 inches thick in loose state, with each lift
compacted to a minimum percentage of the maximum dry density determined by ASTM D 1557
(Modified Proctor Method) as follows:
Application
Within building pads
Roadway/driveway subgrade
Retaining wall backfill
Utility trench backfill
BUILDING SETBACK
% of Maximum Dry Density
95%
95% for top 2 feet and 90% below
90%
95% for top 4 feet and 90% below
The purpose of building setback from the top or toe or an overly steep portion of a slope is to
establish a safe buffer such that if a slope failure should occur the stability of the structure can be
maintained and damages to the structure minimized. To maintain stability of the buildings to be
construction on the new Northeast and Northwest Lots, we recommend that the buildings be set
back at least 20 feet from the crest or toe or any portion of 40% or steeper slopes. Reinforced
concrete or soldier pile retaining walls may be used to regrade the ground and enhance stability
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. -)At 12
Page I I
of 40% or steeper slopes. If retaining walls are used, the proposed building should be set back no
less than 10 feet from the retaining walls. The buildings should be also be set back sufficiently
such that an imaginary plane drawing from the edge of the footing foundations to the toe of
slopes 40% or steeper should be no steeper than 3H:1 V. Also, the footing foundations within 30
feet of the toe or top or any portion of 40% or steeper slopes should be embedded at least 1.5 foot
into the medium -dense to dense advance outwash soils. The footprint bearing soils should be
verified by a geotechnical engineer after the excavation of the building footprints are completed.
DEBRIS WALLS
If retaining walls are not constructed to enhance the stability of the steep slopes uphill of the
proposed new buildings, we recommend that the uphill -side basement walls of the buildings be
extended at least 3 feet above their adjacent finish grade to serve as debris blocking walls in case
a mudflow should occur on the uphill steep slope. The combined basement/debris walls should
be designed in accordance with the recommendations in the BASEMENT AND RETAINING
WALLS section of this report.
BUILDING FOUNDATIONS
Conventional footing foundations may be used for supporting the buildings to be constructed on
the site. The footing foundations should be placed on or .into the underlying, medium -dense to
dense advance outwash soils, or on structural fill constructed over these undisturbed competent
basal soils. Water should not be allowed to accumulate in excavated footing trenches. Disturbed
soils in footing trenches should be completely removed down to firm native soils prior to pouring
concrete for the footings. The sandy advance outwash soils can be easily disturbed by
construction traffic. To protect the footing bearing soils, a 6-inch-minimum layer of 2-inch-
minus compacted crushed rock should be placed over the bearing soils. The footing foundations
may then be poured over the crushed rock base.
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 1 l 2
Page 12
If the above recommendations are followed, our recommended design criteria for footing
foundations are as follows:
• The allowable soil bearing pressure for footing foundations, including dead and live
loads, should be no greater than 2,500 psf if supported on undisturbed medium -dense to
dense native soils and no greater than 2,000 psf if supported on structural fill placed over
firm undisturbed soils. The footing bearing soils should be verified on -site by a
geotechnical engineer after the footing trenches are excavated and before the footings
poured.
• The minimum depth to bottom of perimeter footings below adjacent final exterior grade
should be no less than 18 inches. The minimum depth to bottom of the interior footings
below top of floor slab should be no less than 12 inches.
• The minimum width should be no less than 16 inches for continuous footings, and no less
than 24 inches for individual footings.
A one-third increase in the above recommended allowable soil bearing pressure may be used
when considering short-term, transitory, wind or seismic loads. For footing foundations designed
and constructed per recommendations above, we estimate that the maximum total post -
construction settlement of the buildings should be 3/4 inch or less and the differential settlement
across building width should be 1 /2 inch or less.
Lateral loads on buildings can be resisted by the friction force between the foundations and the
subgrade soils or the passive earth pressure acting on the below -grade portion of the foundations.
For the latter, the foundations must be poured "neat" against undisturbed soils or backfilled with
a clean, free -draining, compacted structural fill. We recommend that an equivalent fluid density
(EFD) of 300 pcf (pounds per cubic foot) for the passive earth pressure be used for lateral
resistance. The above passive pressure assumes that the backfill is level or inclines upward away
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 13
from the foundations for a horizontal distance at least twice the depth of the foundations below
the final grade. A coefficient of friction of 0.60 between the foundations and the subgrade soils
may be used. The above soil parameters are unfactored values, and a proper factor of safety
should be used in calculating the resisting forces against lateral loads on the buildings.
BASEMENT AND RETAINING WALLS
Basement walls restrained horizontally at the top are considered unyielding and should be
designed for a lateral soil pressure under the at -rest condition; while retaining walls free to move
at the top should be designed for active lateral soil pressure. We recommend that a lateral soil
pressure of 45 and 70 pcf EFD be used for the design of foundation walls with level/descending
backslope and rising backslope, respectively; and 35 and 55 pcf EFD for retaining walls with
level/descending backslope and rising backslope, respectively. To counter the active soil or at -
rest pressure, a passive lateral soil pressure of 350 pcf EFD may be used, except that the passive
pressure within the top 12 inches of the finish subgrade should be ignored. The above passive
pressure assumes that the backfill is level or inclines upward away from the walls. The above
lateral soil pressures are under the assumption that groundwater behind the walls is fully drained.
To resist against sliding, the friction force between the footings and the subgrade soils may be
calculated based on a coefficient of friction of 0.60. The above soil parameters are ultimate
values, and proper factors of safety should be used in the design of the basement and retaining
walls against sliding and overturning failures. Basement walls or retaining walls may be
supported on footing foundations seated on or into the underlying very -dense fresh till or very -
hard transitional beds soils, with an allowable soil bearing pressure not to exceed 3,000 psf.
A vertical drainage blanket consisting of at least 12-inch-thick free -draining pea gravel or washed
gravel should be placed against foundation and retaining ' walls to prevent accumulation of
groundwater behind and buildup of hydrostatic pressure against the walls. The remaining
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 14
backfill should consist of structural fill constructed per recommendations in the STRUCTURAL
FILL section of this report. The top 12 inches of backfill should consist of compacted, clean, on -
site soils. The backfill material for the foundation and retaining walls should be compacted with
a hand -operated compactor. Heavy compaction equipment should not be allowed closer to the
walls than a horizontal distance equal to the wall heights. A footing drain, as recommended in
the DRAINAGE CONTROL section of this report, should also be provided for foundation and
retaining walls.
SLAB -ON -GRADE FLOORS
Slab -on -grade floors, if used, should be placed on firm subgrade prepared as outlined in the SITE
PREPARATION AND GENERAL EARTHWORK and the STRUCTURAL FILL sections of
this report. Where moisture control is critical, the slab -on -grade floors should be placed on a
capillary break which is in turn placed on the compacted subgrade. The capillary break should
consist of a minimum four -inch -thick layer of clean, free -draining, 7/8-inch crushed rock, -
containing no more than 5 percent by weight passing the No. 4 sieve. A vapor barrier, such as a
6-mil plastic membrane, may be placed over the capillary break,'as required, to keep moisture
from migrating upwards.
PAVED DRIVEWAYS
Performance of paved driveways is critically related to the conditions of the underlying subgrade
soils. We recommend that the subgrade soils within the driveways be treated and prepared as
described in the SITE PREPARATION AND GENERAL EARTHWORK section of this report.
Prior to placing base material, the subgrade soils should be compacted to a non -yielding state
with a vibratory roller compactor and proof -rolled with a piece of heavy construction equipment,
such as a fully -loaded dump truck. Any areas with excessive weaving or deflection should be
over -excavated and re -compacted or replaced with a structural till or crushed rock placed and
LIU & ASSOCIATES, INC.
September 26. 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 15
compacted in accordance with the recommendations provided in the STRUCTURAL FILL
section of this report.
We recommend that an 4-inch-thick minimum, compacted, crushed rock base (CRB), consisting
of 7/8-inch-minus crushed rock, be used for the roadways. The crushed rock or subgrade base
should be topped with 2-inch asphalt treated base (AT13) topped by 1-1/2-inch-thick Class B
asphalt concrete (AC).
DRAINAGE CONTROL
Building Footprint Excavation
Groundwater is not expected within depth of excavation for the construction of the proposed
buildings. If encountered, the bottom of building footprint excavation should be sloped and
ditches excavated along the bases of the cut banks to direct runoff and groundwater into a sump
pit from which water can be pumped into a nearby storm sewer. The inlet of the storm sewer
should be covered by a filter sack to keep sediments from entering the storm sewer system. A
layer of 2-inch crushed rock should be placed over undisturbed subgrade soils supporting
footings and on -grade slabs, as required, to protect the soils from disturbance by construction
traffic.
Surface Drainage
Water should not be allowed to stand in any areas where footings, slabs, or pavement is to be
constructed. Final site grades should allow storm runoff to flow away from the building. We
recommend the finish ground be sloped at a gradient of 3 percent minimum for a distance of at
least 10 feet away from the building, except in the areas to be paved.
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 3-Lot Short Plat
L&A .fob No. 5A1 12
Page 16
Runoff over Impervious Surfaces
Storm runoff over impervious surfaces, such as roofs and paved driveways, should be collected
by underground drain line systems connected to downspouts and by catch basins installed in the
driveways. Stormwater thus collected should be tightlined to discharge into a storm sewer or a
suitable stormwater disposal facility. Sufficient numbers of cleanouts at strategic locations
should be provided to the underground drain line systems to allow for periodical cleaning of the
drain lines.
Footing Drains
A subdrain should be installed around the perimeter footings of the proposed houses and along
the base of retaining walls. The subdrains should consist of a 4-inch-minimum-diameter,
perforated, rigid, drain pipe, laid a few inches below bottom of the building perimeter footings or
retaining wall footings. The trenches and the drain lines should have a sufficient gradient to
generate flow by gravity. The drain lines should be embedded in washed gravel completely
wrapped in non -woven filter fabric to within about 12 inches of finish grade. The remaining
trenches may be backfiiled with clean on -site soils. Sufficient numbers of cleanouts at strategic
locations should be provided to the footing drain lines to allow for their periodical cleaning and
maintenance. Water collected by the footing drains should be tightlined, separately from the roof
and surface stormwater drain systems, to discharge into a storm sewer.
RISK EVALUATION STATEMENT
The site is underlain by medium -dense to dense advance outwash soils at shallow depth. These
soils are of fair to moderately -high shear strength and have good resistance against deep-seated
slope failures. The key to maintain stability of the site is to maintain stable temporary cut slopes
and to have proper and adequate erosion and drainage control during and after construction. It is
our opinion that if the recommendations in the report are fully implemented and observed during
construction and after the completion of the development, the areas disturbed by construction
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 17
will remain stable and will not increase the potential for soil movement. In our opinion, the risk
of damage to the proposed development and from the development to adjacent properties from
soil instability should be minimal.
LIMITATIONS
This report has been prepared for the specific application to this project for the exclusive use by
Mr. Bill Ritter, and his associates, representatives, consultants and contractors. We recommend
that this report, in its entirety, be included in the project contract documents for the information
of the prospective contractors for their estimating and bidding purposes. The conclusions and
interpretations in this report, however, should not be construed as a warranty of the subsurface
conditions. The scope of this study does not include services related to construction safety
precautions and our recommendations are not intended to direct the contractor's methods,
techniques, sequences or procedures, except as specifically described in this report for design
considerations.
Our recommendations and conclusions are based on the geologic and soil conditions encountered
in the .test borings, and our experience and engineering judgment. The conclusions and
recommendations are professional opinions derived in a manner consistent with the level of care
and skill ordinarily exercised by other members of the profession currently practicing under
similar conditions in this area. No warranty, expressed or implied, is made.
The actual subsurface conditions of the site may vary from those encountered by the test pits.
The nature and extent of such variations may not become evident until construction starts. if
variations appear then, we should be retained to re-evaluate the recommendations of this report,
and to verify or modify them in writing prior to proceeding further with the construction.
LIU & ASSOCIATES, INC.
September 26, 2005
Proposed 3-Lot Short Plat
L&A Job No. 5A 112
Page 18
CLOSURE
We are pleased to be of service to you on this project. Please feel free to call us if you have any
questions regarding this report or need further consultation.
` Glip
1598
I EXPMes 7 / 17 /Zo --7 I
Six plates attached
Yours very truly,
LIU & ASSOCIATES, INC.
n4 --I
J. S. (Julian) Liu, Ph.D., P.E.
Consulting Geotechnical Engineer
LIU & ASSOCIATES, INC.
- --LI U & ASSOCIATES, INC.
- Geotechnical Engineering - - - — -- — - -- - - Engineering Geology
:? pri i W. 2006
Mr. Biil Ritter
8364 Olympic View Drive
L?dmonds, WA 98026
Dear Mr. Ritter:
Subject: Addenduln No. I to 9;26/2-005 Geotechnical Report
On -Site Storinwater infiltration -Trenches
Proposed 3-Lot Short Plat
8364 Olympic View Drive
Edmonds. Washington
L&A .fob No. SA 112
APR
Earth Science
t.
SIX test pits were excavated on the subject plat site. The test pits encountered 0.8 to 2.7 feet of
loose organic topsoil underlaid by a layer of weathered soils of !fight -brown. loose to mediunl-
dense. silty fine sand with a trace of gravel, from 1.6 to 3:5 feet thick. Underlying this layer of'
x eathered soils are advance outwasl, sand deposits of brown -gray to light -brown to light -gray
medium -dense. gravelly: clean to slightly silk, tine to medium sand with occasional cobble, from
1.8 to 3-2 leel thick, and light -gray advance outwash deposit of dense, gravely, fine to coarse
sand. Groundwater was not encountered by any of the test pits excavated up to 10 feet deep.
-Hi-,cc outvyash deposit of cleall. fln� to coarse sand. with Various anioun, of grav2:,,
underlying the.site at depths iron, 3.2 to 6.0 feet below existing ground surface is of high
permeability. The Soil Survey of Snoh(,inish CountyArea of Washin gton, published by in U. S.
Department of Agriculture in cooperation with Washington State Department of Natural
Resources and Washington State University Agriculture Research Center, was also referenced for
the surficial soil unit at the subject site. According to this publication, the advance outwash sand
deposit at the subject site is also classified as 'Everett .Gravelly Sandy Loam with the Soil
19213 Kenlake Place NE • Kenmore, Washington 98028
Phone (425) 483-9134 - Fax (425) 486-2746
Attachment 6A
April 14, 2006
Addendum No.] to 9/26'/2005 Geotechnical Report
Proposed i-Lot,Short,Plat
L&A .lob No_ 5A 1112
Page 2
Conservation Services (SCS)'Classification S_ystem.,,'('able 1.4 of the above publication lists the
permeability of this soil unit at a depth from 6 to 60 inches below grade to —be from 6 to 20 iph
(inches per hour). C)ur :experience of this soil unit in .the neighborhood of the subject site
indicates its in -situ infiltration rate to ,be'in the range from 20 to 40 iph. It is, therefore, feasible
to use infiltration trenches, to dispose stormwater into the ground on' site. We recommend a
design infiltration ra.tt ;of 5.0• iph (iAc>ludim, a factor of safety of at least 4.0) be used for the
design of infiltration trenches.
Infiltration trenches should be located on the downhill of the houses to be constructed on the lots.
They should be setback at least 10 feet froni the houses and 5 feet from property lines. Our
recommendations tiir design and construction of the infiltration trenches are shown on Plate
attached hereto. The bottom of infiltration trenches should be excavated at least 6 inches into the
underl)ring. clean, light -brown to light -gray. advance outwash sand deposit. The soils at bottom
of infiltration trenches should be verified by a geotechnical engineer_ The side walls of the
trenches should be lined with a laver of non-wo%en filter fabric. and the trenches backfilled with
clean washed gravel to within about 12 inches of the finished grade. A 4-inch perforated PVC
pipe through which stormwater is to be dispersed into the ground should be set level in the gravel
till of each infiltration trench. The perforated PVC pipes should be set as high as possible in the
trenches to have maximum separation from the winter- high groundwater table, but should have at
least 18 inches cif-- soil/gravel cover over the perforated pipes. The top of the gravel fill should
also be covered with filter fabric. The remaining trenches may be backfilled with on -site clean
soils.
We are pleased io he of service to you on this project. Please feel free to call us if you have any
questions regarding this report or need further consultation.
Ll U. &. ASSOCIATES; INC.
April 14, 2b06
Addendum No. I to 9/26/2005 Geotechnica! Report
Proposed 3-Lot Short Plat
L&A .lob No. SA 112
Page 3
One plate attached
Yours fiery truly,
LIU & ASSOCIATES- INC.
.I. S. (.Iullan) Liu. Pli.D., P.E.
Consulting Geotechnical Engineer
LIU & ASSOCIATES, INC.
4
r
Y
to o Q
-Z ,
-Z
d
d Q
v
`
- • p,
1
II
0.
�11
`• O Ob
O �
n
4 J
"�
u
oC
-
Go
,00
va
Q'' f.
0
• �
'tl✓ t
� • � •
�� II Iil
. ? iQo O . J ,. 00. 0 0�
It � � I���
111
T -w
IIl
'fvlW ,t81
t-Z J
LL
s a v vA
0
VE
m v- S
LIU & ASSOCIATES, INC.
Geotechnical Engineering - Engineering Geology - Earth Science
J
v
0
t--
z
YPICAL SECTION - INFILTRATION TRENCHES
BILL RITTER 3-LOT SHORT PLAT
8364 OLYMPIC VIEW DRIVE
EDMONDS, WASHINGTON
JOB NO. 5A112 1 DATE 4/14/2006 I PLATE 1 .
d5
LIU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth Science
October 5, 2006
Mr. Bill Ritter
8364 Olympic View Drive
Edmonds, WA 98026
Dear Mr. Ritter:
Subject: Feasibility of Shoring Wall for Grading and Building Support
Proposed 3-Lot Short Plat
8364 Olympic View Drive
Edmonds, Washington
L&A Job No. 5A112
We understand that a permanent shoring wall is being contemplated for grading and building
support for a new residence to be constructed on the northwestern lot of the subject 3-lot plat.
The shoring wall is to be located along the back (uphill side) of the house. It will be used for
retention of building footprint excavation and for foundation support of the house.
It is our opinion that such a shoring wall will be feasible in achieving its intended purposes. We
will be glad to present the design and construction recommendations for this shoring wall if you
decided to proceed with it.
Yours very truly,
7 LIU SLIU SSOCIA , INC.
4
J. S. (Julian) Liu, Ph.D., P.E.
Consulting Geotechnical Engineer
Oplus 7/17/
19213 Kenlake Place NE - Kenmore, Washington 98028
Phone (425) 483-9134 - Fax (425) 486-2746
Attachment 6F
CITY OF EDMONDS
ENGINEERING REQUIREMENTS FOR SHORT PLATS
Name: RITTER File No.: S-06-44
Reviewed by: Lyle Chrisman Vicinity: 8364 Olympic V►eAz Or:ve
Fnoineerino Divicinn (late
Req'd prior
Req'd
Bond
Complete
to
wlbldg.
posted
recording
Permit
1. Rights -of -way for public streets:
No dedication required ---- _._.._._..---
.--------....—..---
-- --- --
-- ------ --
-- -- -X -- - - -
2. Easements (City utilities, private access, other utilities):
as needed. _ _ _ _
— —_X_—__---
_ _Provide _all _easements
Obtain Access easement rights from Snohomish County for
X
access across property along Olympic View Dr in order to
provide additional easement width between Olympic View Dr.
- and subject property line — -- - ---- -- — ---- -- - -- ----
-- - ---- -- ----
---- - - ... -
- - -- -_
-- ---------------- -- - -
Private access easement shall be a minimum of 20' feet in width.
X
3. Street improvements ACP with curb and gutter): .
Construct 18" curb & gutter along property frontage with the face
X
of curb located 12' from the painted centerline.
Private access road serving all lots shall be paved a minimum of
X.
16.0' in width, plus 18" asphalt thickened edge.-- -.._._.. ----
---------- -
------
-------- --
-- --- ---
- Slope of private access road/driveway shall not exceed 14% _
_ -X
4. Street tumaround:
Provide on -site turn around for lot A.
X
5. Sidewalks and/or walkways:.
Construct 5' wide sidewalk along�ropert� frontage_ _ _
X
6. Street lights:
_.
N/A
--- --
------- —
X
-- -----
7. Planting strip:
. _
.
N/A
X
8. Waters stem improvements
Install 4" storz adapter on the existing_hydrant .
X
Provide new water service to each lot.
X
- Connect to public water system:
X
X
http://cdmondspmtweb/permittrax/PermitTraxMain/Attachments/Live/PERMIT/PMT-54236/3132007113224807.doc for Attachment 7
Req'd prior
to
recording
Req'd
w/bldg.
Permit
Bond
posted
Complete
9. Sanitary sewers stem Improvements
Provide new sewer service to each lot
Connect to public sewer system _--_— — —__
X
X
—X
10. Storm sewers stem improvements
Provide new storm sewer service to all proposed lots
Construct storm detention system sized to provide adequate
capacity for all proposed single family dwellings and access
iovements in accordance with ECDC 18.30.
Connect to Public StormsY stem
__..._._...-.__...----- - - --------- -- ---- - --- - ------ --- -- -- -- ---
X
X
X
---------- ..._._._...
- - -- .._...
-- -- ---
- - ... - - --- -
11. On -site drainage (plan per Ord. 3013):
Connect all new impervious surfaces to detention system.
X
X
12. Underground wiring (per Ord.1387):
_ Re
.. _ ....__quired for all new services --------------- -- ----- --
X
- ---- -- ----
X
- --- - —
----...----
-- _.--_._.. -
13. Excavation and grading per IBC, appendix . (2003 edition))
_ Submit a gradingplan as part of engineered site plan. _- _
Grading
Grading for foundations to be included with building permit only
- --X _ _
_
x
-X
14. Si page (per City Engineer):
Provide Are and aid address e sig nag
- - ---- - - ---- --- ---- ------- --- ...- - - --- ------ -
Provide "Access Ends"
-- --- - ----
X
X
-- ._... -...
X
---- -- --- -
-------.._._.-..
15. Survey monumentation (per Ord., Section 12.10.120
N/A
X
16. As -built drawings (per City Engineer) -
for all utility construction..------- - - ---- ---------X
--..--
- -X -- ...-
--------
-------------
17. Other requirements:
-a) _ Plat showing lots, easements, legals, survey_ information __-
b) Legal documents for each lot - --
c) Field stake lot corners (by professional surveyor) — __—
d) Field stake utility stubs at property lines; -_ _ _
e) Clustered mailbox location per Postmaster — _ _---
f) Maintenance agreements
-_ X - _
X
- _ X-
X
X
X
— X --
http://cdmondspmtweblpermittraxfPermitTraxMainlAttachmentsILivelPEkMITIPMT_54236131320071 13224807.doc form revised: 1/2/07
Req'd prior
to
recording
Req'd
w/bldg.
Permit
Bond
posted
Complete
18. Engineering fees:
a) Storm development charge Lace ess only)_ $
- - --
X
_
_.._._-b) Storm drainage connection fee (sfr) ----._....---$428/lot
..._.._...-
------ - -- - -
--- -- -- -- --
c) Sewer connection fee:
--------- --- --
- -X...- ._.....
X
d Water connection fee:
x-
e) Water meter fee -'14" meter:
}{
— f)-Traffic mitigation fee— $840.72/ new lot — $
_
_ g) Plat review fee ($860 per short plat)
X
_._._. _._X_._-._.._..
h) Short plat inspection fee(2.2% of improvement costs)$ TBD_._..._
_ - -$860
---- -- - - -- -
X
- -- - - - --- --
-
A.L..Chrisman
13 Mar 07
ENGINEERING PROGRAM MANAGER, CITY OF EDMONDS DATE
The Engineering requirements have been completed and the subdivision can be recorded/
Authorized for recording by;
Date:
http://edmondspmtweb/permittrax/PermitTraxMain/Attachments/Live/PERMIT/PMT-54236/3132007113224807.doc form revised: 1/2/07
November 27, 2006
To: City of Edmonds Development Services Department
121. 5 "h Ave. N.
Edmonds, WA 98020
RECEIVED
NOV 2 7 2006
EDMONDS CITY OLERK
From Erie and Connie Falk
8310 %mpi, View Dr. (mailing address P. O. Box 661, Edmonds, WA)
Edmonds, WA 98026
425 672-1-7620
RE. Notice of Development File # S-06044 (subdivision at 8364 Olympic View Dr.)
W'e have reviewed. the listed application and. have some concerns. We obtainedfour
documents associated with the developers (Mr. Ritter) application. One of the documents
is a copy of the Snohomish County Parks and Recreation Special Use Permit # 072704-
0001. The next was a map of the proposed short plat that had a date stamp, of 4' October
L2, 2006 Permit Counter" The next was a.letter from. fc City of F ritonds dated
November 1, 20006 titled " Subject of completc Application" and sited by ten Machum
and last document rms a City of Edmonds entail that written by Lyle Chrisman and sent
to Jen i` atahuga.
It was a surprise to see the county issued a permit %kithout notifying neighboring property
owners. I phoned the Snohomish County Parks and Recreation office and spoke with
Diastne Bailey about the permit_ She confirmed that the limit was issued on July 31=
2006. She said the permit allowed Mr_ Ritter to install a ten -foot wideroad, which he
could pave, for ingress and egress purposes to meet compliance for the City of Edmonds
Planning Department, Diane said the. permit didn't authort=. Mr. Ritter to place any
utilities (specifically a 4" sty drain) wifto or taM er the ama oudir in the permit: or
designated on the short plat/ grading drainage mar on file in this applicatirxt. Diane said
a request to place utilities within the area was never discussed w11th the parks department
and to do so would he a violatiott of the existiWpermit: We also rto- ced the rnaprdidn't
show a road or driveway leading- to the new house (on the east- lot) flarn Olympic View
Dr. The map showed access to the new house on the east lot is an angled driveway off
the existing private driveway. If that is the case then what is the purpose of needing the
special use permit to cross the existing county park?
Another area of concern. is the discrepancy between. the above listed letter and email. The
letter indicates the land use application submitted by Mr. Ritter is complete but the email.
indicates there is a sight distanc-e issue that needs to be. addressed. Lylc told den that Mr_
Ritter would need to reshape the hillside and remove some trees all within the Count%
pr Attachment 8
Park. I couldn't find anything within the file that indicated Mr. Ritter was notified of this
or that. he met the request. Diane Bailey said the Snohomish. Cofmty Parks and
Recreations has not received further requests from Mr. Ritter to do anytd<ing :vithin the
park other than what it listed irr the above special use permit, which was dated
a pproxirrtate ly three ritoritt`is before the -email frorr[ i,yte to Jeri.
Our other concern is the impact that the excavation of the two lots and construction of the
house will have on our property and the private driveway used by us and the other two
homeowners (excluding Mr. Ritter) for daily ingress and egress, We don't feel we should
be burdened with repairing. the private driveway when it is datx►_afed by construction
equipment or unreasonable delays to access our property during development and
construction;
We have no desire to stop Mr. Ritter from developing his property. We want to make
sure our personal and public intermts are protwed and that his dealing with the City and
County are wi-thirt guideline. I have some question about -the ptacmentall the utittue�
but I wasn't -able to get the answers before the end of the comment period.
I will also tell you that. Diane Bailey of the Snohomish. County Parks and Recreation
office ,&w surprised when I described the drainage map to her and informed her there
would be two new houses built on the existing property. She said Mr. Ritter told her he.
was dividingthe lot and building. one more house, not two. She asked me to send her a
copy of the map and said she world review it and address the permit if nemsary.
Pleasc keep us apprised of the situation and call if you have further questions. Thanks for
your time-.
Sincerely,
Eric M. Ea
(�
Connie, A. Falk
Rate 2 of 1
E jaamq:3ujlV
6 . = >
�>q x
F �� yycn
e
\
cz \
1
a 'p
n N ?
ySoo�y $ y. �� •_
"_�L p=
qoq pko�Y
2 T O 1G. �0j06�
GNo
o
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
u5E PERMIT
ZONE
NUMBER
JOB SUITE/APTA
ADDRESS � n
NO
OWN/ER NAVE rNAME OF BUSINESS J/
C, w...•i / 1 �P V�1 • ih
LEGAL DESCRIPTION LNECK SUB'D1mSI 0.
� f'C,4 NIA
UO NO IN
N I^
2
MAILING ADORES: /^,
a344 L//Jl �_( / 'ilf Ar-
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP.
EYISTIND REWIRED DEDICATION
PROPOSED
TEWPAP PYN, `ES D
qW parmX q
U. Fwr K& 0
BnFpFct1PII RFRIInM�O
SIeaR4L rapus.e NO D g
GIT• 2tv
L ,Ivre
TELEPHONE NUMBER
LL --//
92�- V'-S/Z^Y�
NAME / +
►"L -//7 L Lllxi:%
METERSIZE
LINE SIZE
NO.OF FIXTURES
PRV REWIRED F
YES D No o
\
Vj•.
ADDRESS �? i
Pa [Lx'`x /!'Fl
REMARKS
�a{
i0AL(/JSPa!:n-J •R.�tiIQ. I!I !'iIFLL Q}/1'�E/OBn
IB
CITY ZIP
J�.�ianw�ilj h'1
TELEPHONE NUMBER
'ls•4b'/- h'Z
CU" .Vs StawN— A441AJFW1 /o
AND 2r FAIN, C- LCAIlL 7yN E ID R-oOF2X-Y
NAME
ENGI E NG MEMO DATED REVIEWED BY
9� 48
I
CITY / / ZIP
J�QAsYrm>S 0
TELEPHONE NUMBER
-77p- ��9
L�VIFI,
FIRE MEMO DATED REVIEWED Y
STATE LICENSE NUMBER A 1
EXPIRATION DATE
COMPLETE EXEMPT ALLOWED P D A40WED
EXP /
LOT COVERAGE REWIRED SETBACKS (FT.) I PROPOSED
ALLOWED IPROPOSED FRONT S�AR FRONT V
TaXAccounl /C L7c /^/-0 .•-QOa /=
Parcel No. '/ H
LOT AREA
�iaNNIN IEW BY
p
NEW O RESIDENTIAL O PLUMS EEl
ADDITION COMMERCIAL O CHANGE Of US
REMODEL ART.EILLI. WON
REPAIR PENCE K—rn
DEMOLISH ❑ INSERT0 a MM POOL/LOTS A
OGARAGE RETAINING WALV ❑
CARPORT Ll ROCKERY RENEWAL
C
REMARKS
r i N
KED eY TYRE OF CONSTRUCTION
CODWODS'E
BPECI TOR
REO
Y
AREA
A KB
GORE& IN ECTIONS PER UBC 108
[TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN:
AIL Mho
NUMBER
STORIES
NUMBER OF CRITICALOF AREAS �%'%
UNITS NUMBER / • /a 9
JF G✓lClp (IC Gt3S h"[ r
VALUATION
TEE
N CHEC 11
HEA1 SOURCE: GLAZING
WILD
PWMBING
Plan Check No. p _ 7
MECHANICAL
This Permit covers work to be done on private property ONLY.
GRADINGF140
Any construction on the public domain Icurbe, sldewvlke,
driveways, marquees, etc.) will require separate permission.
STATE SURCHARGE
Permit: Application: 180 Days
Perm! l Limit: 1 Year - Provided Work Is Started Within 180 Drys
STORM DRAINAGE FEE
**Applicant, on behalf of his or her spouse, heirs, assigns and
ENG. INSPECTION FEE
30- —
w
successors in interest, agrees to indemnify, defend and ITOld
W
harmless the City of Edmonds, Washington, Its Of Dial
iemployees,
and agenls from any and all claims for damages of
whatever nature, ariaing directly or Indirectly from the Issuance
T
of this permit. Issuance of this permit shall not be deemed to
PLAN CHECK DEM517
3
omodify,
waive or reduce any requirement of any city ordinance
z
nor limit in any way the City's ability to enforce any ordinance
TOTAL AMOUNT DUE
LV
provision."
FY
I hereby acknowledge that I have read This application; that the
Information given is correct; and that I am the owner, or the duly
ATTENTION
APPLICATION APPROVAL
authorized agent of the owner. I agree to comply with city and
THIS PERMIT
slate laws regulating construction; and in doing the work authoriz•
AUTHORIZES
This application is not a permit unt
e0 thereby, no person will be employed in violation of the Labor
ONLY THE
signed by the Building Official or hisih
Code of the State of Washington relating to Workmen's Compensa•
WORK NOTED
Deputy; and fees are paid, and receipt i
tion ins ranee aria CW .27.
INSPECTION
acknowledged in space provided.
SIG ATCRE IOWNER AGE I DA(TT-E SIGNED
DEPARTMENT
CITY OF
OFFICI S1 TUBE DATE
CALL FOR
RELEASED Dv DATE
ATTENTION
INSPECTION
1T IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE
UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
��� �OGGO
ORIGINAL — FHe YELLOW — InspeCl
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC
SECTIUN 109
PINK — OWner GOLD — Assessor
er
y�'Yi r Yi;r
it
s
n 5 a�yJ
r.E•y .f .
:.
Y t:r
Y dPYaN'aa
"+ xar my3�r1 '�'fR+vc y
1 •'Sn€?;;
ncC.189v
CITY OF EDMONDS
121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771.0220 • FAX (425) 771.0221
DEVELOPMENT SERVICES DEPARTMENT
Planning ° Building • Engineering
September 30, 1999
Curtis D. Smith
8344 Olympic View Dr.
Edmonds, WA 98020
Re: Plan Review #98-276
BARBARAFAHEY
MAYOR
This letter is to inform you that the above referenced application has expired. If you are
withdrawing the project, please send a letter notifying us that you no longer need this
permit. If you are still in need of this permit it will be necessary to reapply for the
grading permit with new fees, as well as, we need the letter for the new address since the
driveway was going to be changed.
If you have any questions, please call at (425) 771-0220.
Thank you,
Susie Read
Development Services
Incorporated August 11, 1890 °
Sister City - Hekinan, Japan
Critical Areas Checklist STREET FILE
Site Information
Project Name: Ccrrfls � � / Per<nit.Number:
Site.Location: �'39¢ "- � "� Prw'r:?- Property Tax Account Number. ,Z
Approximate Site Size (acres or square feet):
Have you filled out a Critical Areas Checklist for a project on this site before? �" a
General Site Conditions
1. Has the site been cleared or logged? le� Date of most recent action
Soils / Topography
2. In, the Snohomish County Soil Survey, what is the mapped soil type(s)?
3. Describe the general site topography. Check all that apply.
4,'/ Flat: less than 5 feet elevation change over entire site.
Rolling. slopes on site generally less than 15% (a vertical rise of 10 feet overa'
horizontal distance of 66 feet.)
Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise
of 10 feet of horizontal distance.)
Steep: grades of greater than 30% present on site.
Comments
Hydrology/Vegetation
4. Site contains areas of year-round standing water:
5. Site contains areas of seasonal standing water: / Approx. Depth:
6. Site is in the floodway NU floodplain ' of a water course. /
7. " Site contains a cree� or an area where water flows cross the grounds surface? /J flows .
are year-round? II-- Flows are seasonal?
8. Site is primarily: forested ;meadow ; shrubs ; mixed
9. Obvious wetland is present on site: �o
10. Wetland inventory or map indicates wetland present on site: 7>
11. Critical Areas inventory or map indicates any Critical Area on site:
e90.199-
City of Edmonds
Critical Areas Checklist
The Critical Areas Checklist contained on
this form is to be filled out by any person
preparing a Development Permit
Application for the City of Edmonds prior
to his/her submittal of a development -permit
to the City.
The purpose of the Checklist is to enable
City staff to determine whether any potential
Critical Areas are or may be present on the
subject property. The information needed. to
complete the Checklist should be easily
available.from observations of the site' or
data available at City Hall (Critical Areas
inventories, maps, or soil surveys).
An applicant, or his/her representative, must
fill out the checklist, sign and date it, and
submit it to the City. The City will review-'
the checklist, make a precursory site visit,
and make a determination of the subsequent
steps necessary to complete a development
permit application,
With a signed copy of this form, the
applicant should also submit a vicinity map
of the parcel with enough detail that City
staff can find and identify the subject
parcel(s). In addition, the applicant is
encouraged to include any other pertinent
information or studies in conjunction with
this Checklist to assist staff in completing
their preliminary assessment of the site.
I have completed the attached Critical Area Checklist and attest that the answers provided are
factual, to the best of my knowledge (fill out the appropriate column below).
Owner / Applicant:
Name �C
� aO
Title
Street Address
City, State, ZIP Phone
Signature Date
Applicant Representative:
Name
4.
Title
Street Address
City, State, ZIP Phone
Signature Date
r CA FILE NO.
4
Critical Areas Checklist
------------------ --------------------------------------------
• Site Information (soils/ topography/ hydrology/ vege tion)
1. Site Address/ Location: ? 3 4 4 0- t V 1' �J. , v 4
2. Property Tax Account Number: 'D I � C)q j U 77 Z CC) C, C G_
3. Approximate Site Size (acres or square feet): 69 2 G 0 0
4. Is this site currently developed? _ yes; )KI, no.
If yes; how is site developed?
5. Describe the general site topography. Check all that apply. r
Flat: less than 5-feet elevation change over entire site.
L
Rolling: slopes on site generally less than 15 % (a vertical rise of 10-feet over a
horizontal distance of 66-feet).
Hilly: slopes present on site of more than 15 % and less than 30 % ( a vertical
rise of 10-feet over a horizontal distance of 33 to 66-feet).
Steep: grades of greater than 30 % present on site (a vertical rise of 10-feet over
a horizontal distance of less than 33-feet).
Other (please describe):
6. Site contains areas of year-round standing water: /IJCl ; Approx. Depth:
7. Site contains areas of seasonal standing water: A/ Approx. Depth:
What season(s) of the year?
8. Site is in the floodway floodplain of a water course.
9. Site contains a creek.or an area where water flows across the grounds surface? Flows are
year-round? Flows are seasonal? �- (What time of year? '' "" W o C
10. Site is primarily: forested k meadow
shrubs ;mixed
urban landscaped (lawn,shrubs etc)
11. Obvious wetland is present on site: .
5 Site wikhin clesignatecl earth subsYcience landslzdehazari area
...:..:.:.::
fl.:...:.;::' .:.
designated on the Environmentally Sensit7ve Area§ AR:-
.
DE`FE!WINATI S'TiJDY REQLTIT sD �.
T ONDTI` "t irVAIt�E1Z
^ca chkdoc; Rev 02/11/97
City of Edmonds
'NIW CRITICAL AREAS CHECKLIST
The Critical Areas Checklist contained on this form is
to be filled out by any person preparing a
Development Permit Application for the 'City of
Edmonds prior to his/her submittal of a development
permit to the City.
The purpose of the Checklist is to enable City staff to
determine whether any potential Critical Areas are, or
may be, present on. the subject' property. The
information needed .to complete the Checklist should
be easily available from observations of the site or
data available at City Hall (Critical Areas inventories,
maps, or soil surveys).
An applicant, or his/her representative, must fill out
the checklist, sign and date it, and submit it to the
City. The City will review the checklist, make a
precursory site visit, and make a determination of the
subsequent steps necessary to complete a development
permit application.
Please submit a vicinity map along with the signed
copy of this form to assist City staff in finding and
locating the specific piece of property described on
this form. In addition, the applicant shall include
other pertinent information (e.g:, site plan, topography
map, etc.) or studies in conjunction with this Checklist
to assist staff in completing their preliminary
assessment of the site
I have completed the attached Critical Areas Checklist and attest that the answers provided are factual, to the
best of my knowledge (fill out the appropriate column below).
Owner/Applicant:
Name
.. OX
Street Address
qlozo
City State Zip
(tj2SFy)
Telephone
9;6
W
Signature
�-
Date
c: re cep tion\j ana\cac I . doc
Applicant Representative:
Name
Street Address
City / State Zip
Telephone
Signature
Date
(over)
cl
STREET
I S�-
•
a
CITY OF, EQM0hj
PS
DEj.Ap ,TMENT
PM -MIT
SEWER
7
Call. -PROSPect '6711-07*. When work
is ,ready ;for AnspcetiOn. (N I o Inspec.
Saturday, turday, S,,day or holl4ay,.y. ' N2 3051
ADDRESS .......... �: 215 - 84th Avenue West
. ............................................ I ............................. .......................................... .............
Owlvkn.............. Camer ................................................
on ... A...-S.-tew .art-
............................. CONTRACTOR ........ owin.e. r
Permission Is granted .......... ...................................
....... _.,,.Ju y ........ !!, 19 ... for .....
t. e with 8 .... ......... days to.REPAIR or CONNECT
I th application on file and g
ql-': W.i h-'City Sewerstin accordaw
OVerning ordinances. a:s1de sewer
ATTENTION IS CALLED TO THE
FOLLOWING:
NOTE No. I —The- owners of the Property may obtain a Permit to construct sewer Inside prep
be employed to construct side sewer In street area. Do not cover an Portion of property line. 'A licensed Side Sewer Contractor must
sewer before It has been Inspected.
NOTENo. 2—Obtain full Information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit.
NOTE No. 3—Top of Bid .
e sower Must have at least 30 Inches coverage at Property line and 12. Inches Inside property line; minimum grade of 2%.
NO bends in grade sharper than % will be Permitted.
NOTE No. 4—Trenchesuintstreet must be water settled and surface of street restored to original condition. Contractors shall be responsible for
failure due 0 improper work whichmaydevelop within one year Of Completion.
NOTE No. 6—It is unlawful to alter or do any other work than Is provided for In the Permit, or to do any work on the main sewer Or its appur-
tenanCes except to Insert the Pipe into the wye.
n ; Wl,—,,3?,?.""gr"g,-.. mwmmwxm��
•' d
Cu+
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
OWNER NAME/NAME OF BUSINESS
w Cur//8 9. is.-.- , .
MAILING ADDRESS
0
CITY / ®®ZIP TELEPHONE NUMBER
� ^ v w 4Pe9 CA ZA02-0
NAME
4aie
ADDRE
CITY ZIP TELEPH NNE NUMBER
�y q
NAME
G,eE,ff" C
Cr ADDRESS
U
O �y ^ ZIP TELEPHONE NUM`/�
U l S
STIATE LICENSE NUMBER EXPIRATION DATE
Leoal Description of Property - include all easements
rr od>Cr ry
Tar Account
Parcel No.
NEW
;CN RESIDENTIAL
PLUMBING
ADDITION
U COMMERCIAL
MECHANICAL
REMODEL
APT. BLDG.
SIGN
G�p��,-��.G�..7'
F�
FENCE
❑
REPAIR CYDS.
( x_FT)
DEMOLISH ❑ INSERT OVE
INSERT
SWIM
F] HOT TUB/OSPA
RETAINING WALL/
EGARAGE
CARPORT ROCKERY
❑ RENEWAL
(TYPE OF USE. BUSINESS OR EXPLAIN:
NUMBER OF STORIES
NUMBER OF
DWELLING
UNITS
DESCRIBE WORK TO BE DONE (ATTACH PLOT PLAN)
E PERMIT
zGNe q� / NUMBERT
JOB , SUIT APT If
ADDRESS {�[J Q010
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP Approved ❑
RW Permit Required ❑
EXISTING REQUIRED DEDICATION Street Use Permit Req'd ❑
PROPOSED
Inspection Required ❑
—
Sidewalk Required ❑
REMARKS
ENGINEERING MEMO DATED
METER SIZE BUILDING SUPPLY SIZE NO. OF FIXTURES
REMARKS
w
a
3
SIGN AREA SEPA REVIEW 'P::ADB NO.
ALLOWED PROPOSED COMPLETE EXEMPT
SHORELINE
EXP
VARIANCE OR CU PLANNING REVIEW BY DATE
SETBACKS — FEET HEIGHT LOT COVERAGE
FRONT SIDE REAR
BY TYPE OF
SPECIAL INSPECTOR , IAREA OCCUPANCY OCCUPANT
REQUIRED GROUP LOAD
❑YES
REMARKS
PROGRESS INSPECTIONS PER UBC 305 0
J
�r�� JAW �CIR�4il1T`� m
FINAL INSPECTION REQUIRED
VALUATION
PLAN CHECK FEE
HEAT SOURCE:
GLAZING
BUILDING
PLUMBING
Plan Check No.
MECHANICAL
GR.ADING/FiLL
This Permit covers work to be done on private property ONLY.
Any construction on the,public domain (curLE, sidewalks,
driveways, marquees, etc.) will require separate permission.
STATE SURCHARGE
Permit Application: 180 Days
Permit Limit: 1 Year - Provided Work Is Started Within 180 Days
STORM DRAINAGE FEE
"Applicant, on behalf of his or her spouse, heirs, assigns and
ENG. INSPECTION FEE
successors in interest, agrees to indemnify, defend and hold
harmless the City of Edmonds, •°Washington,- its officials,
employees, and agents from any and all claims for damages of
_
whatever nature, arising directly or indirectly from the issuance
of this permit. Issuance of this permit shall not be deemed t0
PLAN CHECK DEPOSIT
modify, waive or reduce any requirement of any city ordinance
nor limit in any way the City's ability to enforce any ordinance
TOTAL AMOUNT DUE
provision."
I hereby acknowledge that I have read this application; that the
information given is -correct; and that I am the owner, or the duly
ATTENTION
authorized agent of the owner. I agree to comply with city and
THIS PERMIT
state laws regulating construction; and in doing the work authoriz•
AUTHORIZES
ed thereby, no person will be employed in violation of the Labor
ONLY THE
Code of/he State of Washington relating to Workmen's Compensa•
WORK NOTED'
C
INSPECTION
?NT) - -
DATE. GNED
DEPARTMENT
CITY OF
EDMONDS
FOR
im
APPLICATION APPROVAL
This application is not a permit until
signed by the Building Official or his/her
Deputy; and fees are paid, and receipt is
acknowledged in space provided.
�FI.CIAL'S SIGNATURE / DA)tE I I I
6
ATTENTION INALL
SPEcrloN , J /o% z/
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE - --�—
UNTIL A FINAL INSPECTION HAS BEEN "-7. AND APPROVAL OR 771-0220 ORIGINAL — File YELLOW — Inspectpr
A CrAfIFICATE OF OCCUPANCY SN GRANTED. UBC
CHAPTER 3. _ PINK -- Owner GOLD — Assessor
toa�ei
i'�'. * _ , «.`.a.:`.%i,•'. «,,_."'"�'.. .. '-�a-" .. .. ....._..-- - -.........._.m.._--_.___..______._......._G' _.- _ ~' '..gin;.,..:;;