%(FileName).msgThank you for checking in Kristin,
We have made progress, however slow at the Pak residence. Mr. Pak's passing did impact the family but getting back to a routine now.
The siding and roof repairs are complete as of this week and we will be requesting a final inspection shortly.
We have managed, by hand, the storm water over the past months. The grading improvements needed are on the HOA property. I am working with Bill Derry on gaining a focus for the "scope
of work" and possible timing of the work. The Pak's want to participate in the improvements as a HOA member and not as a sole action taker. The surface materials in place now have
worked very well over the winter.
I do not have authority to act on geo or utility work at this moment, but will keep acting on the permit needs and coordination with you. We are requesting utility locates for the first
of next week. This will cover the right a way area in front of Lot 5 (vacant) and thru the easterly open culvert crossing, north of Lot 5.
I will get a group email started with Jae Pak and Bill Derry shortly.
Sincerely,
Ken Hovde
Sent from my Verizon, Samsung Galaxy smartphone