00412us,
CITY OF EDMONDS
PLANNING DEPARTMENT
STAFF REVIEW 017 PROPOSED SUBDIVISION
ADDRESS
1 64t-h & 68 W
APPLICANT Mr, Tom-A=hev DATI 1977
___HEARING
ANALYSIS OF DESIGN
y. 1. Lot sizes and dimensions., Total area-14, 39 acres)*minimum perimeter setback=25 ft
a. Areas and setbacks: each _for 1ilhas _an -average ft. andownsan
interest in common open Zoning in RS-20
b. Lot dimension ratio., n Z a In -A -M-
c. Corner lots: Satisfactory-
2. Lot arrangement in relation to topography: Lots- e located around 2 cul-de-sacs
2 level the lotsti
which are located in the portions of
3. Lot width & frontage: -E,.Yrls_
4. Protection of natural features, views, open spneesProtectign of steep slopes,
natural vegetationor exists.
.-
5. Tree Cutting Restrictions: TO BE IMPOSED ON ALL TREES 8" DIAMETER & OVER PER SECTION
ry12.
10.050(C)(2).
ENVIRONMENTAL ASSESSMENT
1. Located in environmentally sensitive area? No 2. Shorelines Management Permit?No
3. Env. Cklist Req'd? Yes 4. Negative Declaration? 5. EIS Required?
6. Planning Department Environmental. Assessment Form? y
REQUIRED IMPROVEMENTS AND DEDICATIONS
1. See City Engineer's Report.
2.
Walks or
pedestrian ways
required?
3. Parks or other facilities required?
4.
Special
requirements or
conditions:
14.39
x 43.,560-626,828
sq.'ft.
1 20,000-
31 units
allowable
Noelle Charleson DATE 7-19-77_1
EDMONDS PLANNING -DIVISION
COMMENTS AND
ADDITIONAL REQUIREMENTS ATTACHED
IF APPLICABLE
BY:
ENGINEERING
DEPARTMENT
(DATE)
BY:
PUBLIC
WORKS
(DATE)
BY:
FIRE 'DEPAR,rMEN'!.'
DATE)
RECOMMENudyr IONS:
I