00468I I
2
3
4
�5:
61
71
8
9
101
111
12 1
13 i
141
15
161
17
181
19
20
211
22
23,
24
25
261
27
29
30
111
1#4
45
46
47
48
49
50
51
52
53
54
55
56
57
58
0%
(3) Vlater. Will the proposal result 'in:
00 Chanj,,es in currents, or the
course or r.1trectioll of wnter move-
11101ILS, in either inarine or fresh
waters?
Yes Maollk= No
x
(11) Changcs in absorption rates,
drainage patLQ1711S, or the rate and
amount of surface water runoff?
(c) Alterations to the course or
flow of flood waters?
(d) Change in the amount of sur-
f ace viater in any water body?
(0) Di s c lia r1w into stirfice waters,
or in any alteration -of surface
waver quality, including but not
jimited to temperature, dissolved
oxygen.or. turbidity?
(f) Alteration.of the direction
or rate of, flow of ground waters?
(V,) Change in the quantity of
ground .wa ters, eitherthrough
direct addix ions, or withdrawals,
or throul,h i 11 L rception of an
aquifer by cuts or excavations?
(h) Deterioration in ground water
quality, either through direct,in-
e c t: j. oil I :..o r t: I iro o h the scep.11, e of
leachate, phosphates, detergents,
waterbarne -vinis or bacteria, or.
OL11V.r SubsLa nces illLO., the, groun'd
waters'! .
Reduction in the amount of
water otlierwise available for
public water supplies?•
x
Explanation: See explanation below
(4) Flora. Will the proposal result in:
(a) Change in the diversity of
specl.es, or numbers of any species
Of fl.()rzl (inc ludiriv, trees, shrubs,
Bras r., crops, microflora and
a.(JUAtiC plants)?
(b) Reduction of the numbers of
any unique, rare or endangered
species of flora?
x
THE DRAINAGE PATTERN AND RUN-OFF RATE WILL BE
IMPACTED BY THE CONSTRUCTION
OF STREETS. DRIVEWAYS AND HOUSES. STORM WATER
RUN OFF WILL BE CONTROLLED
IN THESE AREAS -BY STORM DRAINS, INCLUDING SILLTATION RETENTION AND OIL
SEPARATION CONTROL,%33-