Loading...
00484ENGINEERING REQUIREMENTS FOR PLATS AND SUBD.IV[SIONS Page Two unless, releases of damages and/or drainage easements are obtained from the other property owners affected by said drainage. Any drainage problems created by change of contour during plat development must be corrected, prior to plat approval or release of plat bond. Final approval of plat (release of plat bond) will be withheld until actual drainage as installed has been in- spected by the City Engineer. Erosion controls shall be provided. The following statement shall appear on all plat sheets: Covenant: Owners, and all persons having any present or subsequent ownership interest in these lands, and the successors and assigns of owners or other parties having any said interest, hereby agree that the'City of Edmonds shall be held harmless in all respects from any and all claims for damages for injunctive relief which may be occasioned now or in the future to adjacent land or improvements by reason of the construction, operation and' maintenance of the drainage system, and hereby waive and release the City of Edmonds from any and all claims for damages, excluding damage caused solely by an act or omission of said City and injunctive relief which the owners, or their successors or assigns, may themselves have now or in the future by reason of the construction, maintenance and operation of said drainage system. ,t 10. Utility Easements and Access there to: 10 45 IP 47 v Til 1 T 145 11. Underground Wiring: To be provided in accord- 11 ante with Ordinance No. 1387. Street Lighting shall be also provided with the necessary street light standards and underground wiring connection. 12. Excavation and Grading: Excavation and 12 grading shall conform to the requirements out- lined in Chapter 70 of the Uniform Building Code, 1967 Edition, Vol. 1. Where extensive grading and fill are involved in the development of a plat, a grading plan and specifications shall be prepared. REQID REQ'D PRIOR TO PRIOR TO POSTED COMPLETED P.F.CORDING BLDG PERP,9T