Loading...
00806.CAW • .`7 -Yes Maybe No numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, `• benthic organisms, insects or micro -fauna)? X (7) (8 (b) Reduction of the numbers of any unique, X rare or endangered species of fauna? (c) Introduction of new species of fauna into an area, or result in a barrier to the Y; migration or movement of fauna? X ^' (d) Deterioration to existing fish or. wildlife habitat? X s` Explanation: Any fauna indigenous to tract will be displaced and ' 7Y r a migratory and habitat barrier presented by the nature of�the development - f a ., Noise. Will the. proposal increase existing: noise levels? X Explanation: Noise levels will be minimally increased by noise s` generated by and common to the nature of the development. Concrete F:1 r removal will be required within the right-of-way (noise levels will increase during this phase of development) g Light and Glare. Will the proposal produce, new light or glare? X Explanation: New light and glare will be generated by the normal nature of such a development - Land Use. Will the proposal result in the i a t�era�tion of the present or planned land use of an area? X F Explanation: The site is currently zoned General Commercial but has no existing use associated with it because it is undevel"oped. It used to be a sand, gravel and cement companies' industrial Yard. ob