009638. Estimated Date'for Completion of the Proposal:
June_ 1979.
9. List of all Permits, Licenses or Government Approvals
Required for all Proposal (federal, state and local --
including rezones):
1. Approval of P.R.D. and final subdivision approval by City of
uuuwuuc.
2 Issuance of residential building permits by City of Edmonds.
10. Do you have.any plans for future additions, expansions,
or further activity related to or connected with this
proposal? If yes, explain:
No
11. o you XFow of any plans by others which may a fect the
ptoperty covered by your proposal? If yes, explain:
No
12. Attach any other application form that has been com-
pleted regarding the proposal; if none has been com-
pleted, but is expected to be filed at some future
date, describe the nature of such application form:
See attached Subdivision Application and Environmental Assessment.
B. ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are -required).
1. Earth. Will the proposal result in:
a.. Unstable earth conditions or in
changes in geologic substructures:
b. Disruptions, displacements, com-
paction or overcovering of the soil?
c. Change in topography or ground
surface relief features?
d. The destruction, covering or
modification of any unique geologic
or physical features?
e. Any increase in wind or water
s erosion of soils, either on or off
the site?
f. Changes in deposition or ero-
sion of beach sands, or changes in
siltation, deposition or erosion
which may modify the channel of a
river or stream or the bed of the
ocean or any bay, inlet or lake?
YES MAYBE NO
X
X
X
X
n
-2-