Loading...
009642. Air. Will the proposal result- in: Yes Maybe No a. Air emissions or deterioration of ambient air quality? b. The creation of objectionable odors? X c. Alteration of air movement, moisture or temperature, or any change in climwte, either locally or regionally? X 3 Explanation: Durinq construction oh ienti onahl P odors may hP encountered at the time of Street and driveway paving 3. Water. Will the proposal result:in: a. Changes in currents, or the course or direction of water move- ments, in either marine -or fresh waters? .b . Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? c. Alterations to the course or flow of f000d waters? d. Change in the amount of sur- . face water in any water body? e. Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? f. Alteration of.the direction or rate of flow of ground waters? g. Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of.an aquifer by cuts or excavations? h. Deterioration in ground water quality, either through direct in- jection, or through the seepage of leachate, phosphates, detergents, waterborne virus or bacteria, or other substances into the ground waters? X X X X X _T X X i, Reduction in the amount of water otherwise available for public water supplies? X Explanation: Drainage pattern and run-off rate will be minimally impacted by the cons ru•.: ion o streets, driveways and uildings. Storm water run-off will econ ro a within the project by an interior storm drainage system and directed into holding ponds located within the City park -3-