009642. Air. Will the proposal result- in:
Yes Maybe No
a. Air emissions or deterioration
of ambient air quality?
b. The creation of objectionable
odors? X
c. Alteration of air movement,
moisture or temperature, or any
change in climwte, either locally
or regionally? X
3 Explanation: Durinq construction oh ienti onahl P odors may hP
encountered at the time of Street and driveway paving
3. Water. Will the proposal result:in:
a. Changes in currents, or the
course or direction of water move-
ments, in either marine -or fresh
waters?
.b . Changes in absorption rates,
drainage patterns, or the rate and
amount of surface water runoff?
c. Alterations to the course or
flow of f000d waters?
d. Change in the amount of sur-
. face water in any water body?
e. Discharge into surface waters,
or in any alteration of surface
water quality, including but not
limited to temperature, dissolved
oxygen or turbidity?
f. Alteration of.the direction
or rate of flow of ground waters?
g. Change in the quantity of
ground waters, either through
direct additions or withdrawals,
or through interception of.an
aquifer by cuts or excavations?
h. Deterioration in ground water
quality, either through direct in-
jection, or through the seepage of
leachate, phosphates, detergents,
waterborne virus or bacteria, or
other substances into the ground
waters?
X
X
X
X
X
_T X
X
i, Reduction in the amount of
water otherwise available for
public water supplies? X
Explanation: Drainage pattern and run-off rate will be minimally
impacted by the cons ru•.: ion o streets, driveways and uildings.
Storm water run-off will econ ro a within the project by an
interior storm drainage system and directed into holding ponds located
within the City park
-3-