01.19.2016 email to applicant.pdf
From:McConnell, Jeanie
To:"Rod Wickham"
Cc:Johns, Kristin
Subject:RE: Bergstrom Addition - bld20151001
Date:Tuesday, January 19, 2016 7:27:26 AM
Attachments:image001.png
Rod,
City maps show there is a storm system in High Street (see map below). The plans submitted,
however, did not show connection to this system. Please revise plans as noted in my email below.
Thanks,
Jeanie
From: Rod Wickham \[mailto:rad.design@hotmail.com\]
Sent: Friday, January 15, 2016 12:24 PM
To: McConnell, Jeanie
Subject: Re: Bergstrom Addition - bld20151001
Are you saying there is no storm sewr in the street we can connect to?
Residential
Art of
Design
Rod Wickham
2812 Colby Ave.
EverettWA
98201
425 252 2789
From: McConnell, Jeanie <Jeanie.McConnell@edmondswa.gov>
Sent: Wednesday, January 13, 2016 2:23 PM
To: 'Rod Wickham'
Cc: Johns, Kristin
Subject: RE: Bergstrom Addition - bld20151001
Rod,
The detention system shown in the attached appears to be sized per the City’s simplified sizing
handout, however, it does not include catch basins, invert elevations, connection to the City storm
system, etc. If the intent is to add detention and release it to an on-site infiltration system or
spreader trench, then infiltration rates (determined in accordance with City standards) will need to
be provided along with the submittal.
Please resubmit a stormwater design consistent with City standards and regulations.
Thank you,
Jeanie
From: Rod Wickham \[mailto:rad.design@hotmail.com\]
Sent: Wednesday, January 13, 2016 10:44 AM
To: McConnell, Jeanie
Subject: Re: Bergstrom Addition - bld20151001
Jeannie
Please see the attached site plan and detail for the above project. I was in yesterday
discussing it with you.
If this works for you can you print these out and attach them to the permit drawings?
Best regards,
Residential
Art of
Design
Rod Wickham
2812 Colby Ave.
EverettWA
98201
425 252 2789
From: McConnell, Jeanie <Jeanie.McConnell@edmondswa.gov>
Sent: Wednesday, December 9, 2015 8:06 AM
To: 'brian@distinctiveglass.com'
Cc: 'Rod Wickham'; Johns, Kristin
Subject: Bergstrom Addition - bld20151001
Brian,
Please find attached plan review comments from the Engineering Division in review of the recent re-
submittal. I’m also attaching some additional information regarding the original approved building
permit and approved short plat drainage system. Records indicate your home was constructed in
1980, which consistent with my original plan review comments, would mean that all impervious
surface areas constructed on the site require stormwater management. Stormwater management
was provided when the home was originally constructed, which accounts for those areas
specifically, but any new surfaces constructed since that time shall also be managed. The
comments attached provide additional information regarding this.
Please let me know if you have any questions.
Regards,
Jeanie
*¤ ¨¤ -¢#®¤«« - %¦¨¤¤±¨¦ 0±®¦± ¬ - ¦¤±
jeanie.mcconnell@edmondswa.gov
ΓΑΔȃΖΖΐȃΏΑΑΏǾ ¤·³ ΐΒΒΗ
7¤¡ - ¯Ȁ www.maps.edmondswa.gov
0¤±¬¨³ #¤³¤± (®´±²Ȁ
-Ǿ 4Ǿ 4§Ǿ & ȟ ΗȀΏΏ ¬ ȟ ΓȀΒΏ¯¬
7¤£¤²£ ¸² ȟCLOSED