Loading...
01133PROJEC71AME DATE SUBINITTED ME EUVI RO NTAL ASSESSF1EiiT In order to meet the requirements of the State Environmental Policy Act of 1971, the responsible official must make a declaration of environmental impact as early as possible in the process of evaluating a project. The information in this form gill be used to determine whether it will be necess- ary_to require an environmental impact statement. If an impact statement is not required, a Statement of lNegative Declaration will be placed in the file. 1-f-an impact statement is required, a draft statement must be filed with this office, public notice given and a review period of 30*days allowed. The final statement and comments must be filed 0th the Department of Ecology, Office of the Governor and the Ecological Commission. The Edmonds Planning Staff will assist you in any way we. can in accumulating this information and we would appreciate your cooperation. 1. Land: Area in acres wf Soils type 4 z, ot i t 2--o 4 0,41f I Limitati.ons JR. Description of topography,(% s.lope) 77 V- AMINKMMrirl- KIL 71'-' IS- 7 20 Thee 7 A.' ro j,r e-iAii Grading: estimated cubic ds., PLAk; t(.laL ni YUPM-WE0 y E: If grading or filling wi.11 exceed 500 cubic yards 1-1 1 ling: estimated cubic yds. Pil J,J-' UA-IL je a grading and filling plan must be submitted .-Oth the 2. Mater: application. Stream - estimated flow (cubic feet per second) Will stream be altered? To what degree? Impact on storm drainage (increase in run-off) &LA,15: Estimated area to. be paved /f--)/ c7c. j-e % .5-. 9 Estimated area in open space % Shorelines: within .200 ft. of Mean Higher High I -later IA - Adjacent to shorelines zone ,!.�; :; t.