01193(9) Natural Resources. Will the proposal result In: {
t
(a) Incl•case in the rate of use of any natural
(10)
resources?
X
{
(b) Depletion of any nonrenewable natural
resource?
Explanation: Domestic water and electricity will.be
P
consumed by the
Inhabitants and home construction will Increase
the use of materials of
�
I
i
rE
the Puget Sound area. No non-renewable natural
resources are known
to exist on the site except for the land.
Risk of Upset. Does the„proposal involve a
risk of an explosion or the release of hazard-
ous substances (including, but not limited to,
oil, pesticides, chemicals or radiation) in
k.
the event of an accident or upset conditions?
X
;
Explanation: Limited to potential construction
accidents_.
Sg¢
P the l lproposal alter the
Population. Will p
location, distribution, density, or growth
rate of the human population of an area:
i
Explanation10 families or approximately 35 people will inhabit
:
this site.
I
='
;
(12) llousla. Will the proposal affect existing
housing, or create a demand for additional X
housing?
Explanation: 10 new homes will be made available to house 10 families.