Loading...
01248I DECEIVED CITY OF EDMONDS APR 2 4'79 Engineering Requirements for Plats and Subdivisions 1 CITY OF EDMONDS PLANNING, DEPT. NAME: PLAT OF REALTY HOUSE FILE No. PRD-1-71R ._ HEARING DATE: 4-25-79 PRIOR TO W/BLDG. BOND •VICINITY• RECORDING PERMIT POSTED COMPLETED 1. Right -of -Way 20' required per Offig al Street Map X 2. Paving and Curbs in Public 2. right-of-way:•Curbs not required Paving req d on access & driveway mini um 22' 3. Turn Around: Required on site 3, 4. Sidwalks & Planting Strip: 4• Pedestrian Wall, -way required 5. Access Easements: 5, .Required 25' 6. Water Mains: Connection No City 6. required. Extend existing to serve. Plat 7. Fire Hydrants:'(Per Fire Code) 7. 8. Sewers or Septic Tanks: Connection 8 . of all lots to sanitary sewer required 9. Drainage: a. Submit for approval plans and 9. install public storm facilities. b. Submit and obtain approval of site drainage plan per Ord. 1924 10. Utility Easements and Access 10. thereto: 11. Underground Wiring: To be provided' in accordance with Ordinance #1387 Street Lighting shall also be pro- vided with the necessary street lighi standars and underground wiring con- nection. X X X Ki X VA X ►4 y, F.4 k. 3• k ' is N' { a; J ;T .