01249Page Two 1) REO 1)
�
ENGINEERING REQUIREMENTS F( PLATS PRIOR TO W"rDG. BOND
AND SUBDIVISIONS RECORDING PERMIT POSTED COMPLETED
12.. Excavation and 'Grading: Exca- 12.
yation and Grading shall conform
to the requirements outlined in
X
Chapter 70 of the Uniform Building
Code.
kZ
13. Public Improvements Bond (see 13.
page three) letter required by
X
1979
21 days after hearing
14. Monuments (Per Section 12.10.130)
14.
15.' As-Builts: 15.
g",
16. 2.2% Inspection fee 16.
X
ADDITIONAL REQUIREMENTS & COMMENTS:
a Approved,legals for each lot a.
X
reauired
b. Approved Plat required showing b.,
lots, easements, section, town-
X
ship & range,etc,.;:;
ce C.
d. d
e.
PUBLIC WORKS DEPARTMENT, ENGINEERING DIVISION
The Engineering requirements have been completed and the subdivision
can be recorded.
Authroized for recording by: Date:
0
e .