01350(13) Transportation/Circulation
Assuming two cars per residence,,there will be an additional 14 automobiles which would
generate 470 average daily vehicular trips (7 x 10 ADT). Access to the site will be
from 83rd Ave.-'W. Adequate off-street parking would be constructed with each unit but
street shoulders on -site could provide additional space for occasional peak parking needs..
(14) Public Services
r
a. Fire protection is through the City of Edmonds. The nearest station is located at
o e ay, 1/2 mile from site.
b. The Edmonds Police Deparment provides service to the area.
c: The site is within the Edmonds School District. Students will be served by:
Enrollment Capacity
.
Chase Lake Elementary.
.
(84th.& 216th)
College Place Junior High 815 708
(208 S.W. & 76th Ave. W)
Edmonds Senior High 1070 1314
(212nd,S.W. 76th)
1.
Establ-fished projections for student generation from apartments is 35 students for 100
;a
apartments. From this, it:is expected that the.project would add little to.total
enrollment at these schools.
,
f
(16) Utilities
All utilities would.be extended from existing systems. Electrical service is by. Snohomish
County P.U.D. General Telephone Co. would provide communication services along the same
route as.electrical services. Sanitary sewer and water service is provided by the City of
}.
Edmonds. Storm drainage will be provided on -site. Solid waste disposal is by private
$`
contract.
E
SURVEYING ENGINEERING PLANNING MANAGEMENT