01359CIVIC C[NTCR
a®O FIFTH Ava. N.
t
i
i
Office of Superintendent of Public Works C0T� OF EDMONDS
John E. Moran Snohomish Counfy, Washington
August 13, 1963
Planning Commission
Edmonds Civic Center
Edmonds, Washington
Re: Plat of Luschen's Edmonds, Addition
Gentlemen:
The above captioned plat has been carefully reviewed by the
I undersigned and problems relating to the plat discussed with members of
the, Planning Commission. Recommendation is respectfully made that this
plat be approved subject to the following stipulations:
1. A four -inch water line with appurtenances be installed
on Seventh Avenue south of Elm.
2. Install all necessary storm sewers and drainage facilities
per drainage plan. -Where drainage is across adjacent pri-.
vate property, necessary release of damages or drainage
easements must be furnished. Any drainage problems created
by change of contour during plat development must be cor-
rected prior to final plat approval or release of plat bond.
Final approval of plat (or release of plat bond) will be
withheld until actual drainage as installed has been.in-
spected and approved by the City Engineer.
3. Seventh Avenue to be paved to a width of 18 feet and curbs
and gutters installed on the east side.
4. Curbs and gutters installed adjacent to lots one and two on
Elm Street and, at such time as the remaining portion of this
plat is developed, Elm Street will be paved on the south 20
feet and curbs and gutters installed. The proposed interior
street will be paved to a width of 36 feet, curbs, gutters,
and sidewalks installed. Eighth Avenue will be paved on the
west side adjacent to the proposed plat to a width of 20 feet
and curbs and gutters installed.
=.