01361August 21, 1963
Mr, George 0. Luschen
1218 8th Avenue So.
Edmonds, Washington
RE: File No. P-6-63 I`
_Dear Mr. Luschen:
The Edmonds Planning Commission,'at their regular meeting of August 19,
1963, approved the preliminary plat of Luschen's Edmonds Addition subject
to conformance with the requirements of the City Engineer, as follows:.
1. A four -inch water line with appurtenances be installed on `
Seventh Avenue south of Elm.
2. Install all necessary storm sewers and drainage facilities
per drainage plan. Where drainage is across adjacent private
property, necessary release of damages or drainage easements
must be furnished.. Any drainage problems created by change
of contour during plat development must be corrected prior
to final plat approval or release of plat bond. Final approval
of plat (or release of plat bond) will be withheld until actual
drainage as installed has'been inspected and approved by the
City Engineer.
3. Seventh Avenue to be paved to a width of 18 feet and curbs
and gutters installed on the east side. �.
4. Curbs and gutters installed adjacent to lots one and two on. -
Elm Street and, at such time as the remaining portion of this
plat is developed, Elm Street will be paved on the south,20
feet and curbs and gutters installed. The proposed interior
street will be paved to a width of 36 feet, curbs, gutters,
and sidewalks installed. Eighth Avenue will be paved on the
west side adjacent to the proposed plat to a width of 20 feet
and curbs and gutters installed.
5. Right-of-way for Seventh Avenue to be graded back to the
property line on all lots,and driveways to be constructed
of Portland Cement Concrete in conformance with the City of
Edmonds standards.