01372`.
,'. �, ', '' i ,hF,l 'tc f ldi�S1 i 4�• r, n. ,
...«.
,.,.,:... .. •...,.. _..
.art„; � I'L,t�'I';, I'I,.Iltl:
L,NC111L'I�LI IJt; I21'��•�11 I liltihlL.J 1,� iZ�sCOI:I�Ti`IG
'i'��•
'.� l',Efl,'... I;t1ll�
Pi:JlitIIT Pns'.M.,D CUPIPLCT);D
.•,N[?. SUBDIVISIONS f� ,
- -
12. I xchvation a11cl (:,r. ailing : I:::ca- 1.2 .
vation and Grcl.i_ncJ shall Cmf:or.m
X
to the requirements outlined iti
Chapter 70- of the UnifbrIII Building
a Code.
13; Public Improvements Bond (see 1.3.
page' three) letter.,required by
21 days after hearing
iffy Coun i1 relim lit a r val
14. Monuments (Per Section 12.10.120)
Locate or install at'intersectiaQ f
20
X
15. As -Guilts : Required. for• all Public
X
improvements
16 2 2`� `InsPbction fee 16
ADDITIONAL REQUIREMENTS',& .COI�LMLNTS
a: Approved .legals for proper a
required
I
b`, . .Approve d Plat required showing b.
'town-
t•ey easements , "section,
X
ship & ranges etc.
c: Pathway from vicinity of northeast c'r rner'of
_west into Pine Ridge Park
---
C1 E14GIDIEBIt OF LD-IONI).> �)el'1' ,.
PUBLIC WORKS DEPIIRTIMENT, ENGI�dLrRING DIVISION 5'
The Engineering requirements have, been comn.ldted and the subdivision
can he- recorded.
J by:Data — -- "
Authroized for .recording