Loading...
0143_001.pdfENVIRONMENTAL CONSULTING January 25, 2019 Mike and Mary Dolan 25404 Riata Street Leavenworth, WA 98825 RE: Planning Review Comments — Wetland report (BLD20180613) The purpose of this letter is to respond to planning review comments on the Critical Area Report and Buffer Enhancement Plan (Wetland Resources, Inc., dated November 2, 2018). Comments received are cited below in italics with responses in normal text. a. Confirm the wetland habitat score, the resulting wetland category, and the appropriate wetland buffer distance per ECDC 23.50. 040.E. [Ordinance 4026] The wetland habitat score has been confirmed to be correct. b. Show the standard stream buffer, wetland buffer, and the required 15' building setbacks from the edge of the stream and wetland buffers on Appendix D. The standard stream buffer, wetland buffer, and the required 15' building setbacks have been added to the Critical Areas Report and Buffer Enhancement Plan Map (Appendix D). c. The proposed location of the interrupted buffer north of the house doesn't make sense. If the house and other existing paned areas are the interrupting features, the buffer would have to be south of those features. Please review and revise as appropriate. Per personal communication with Edmonds planning staff, the interrupted buffer remains on the northern side of the house. Note that in the original submittal an area of paver patio was missing from the Existing Conditions Map (Appendix C). This has been corrected and the interrupted buffer and calculations of impervious areas to be removed and new impervious areas have been adjusted accordingly. d. Verify whether any of the proposed wort; particularly the deck and addition on the north side, is subject to "additions to structures existing within wetlands or wetland buffers" in ECDC 23.50.040.1(and similar code language for streams in 23.90.040.D.4) or "development within the footprint of existing development" (ECDC 23.50.040._7 and 23.90.040.D.5). Update proposed mitigation ratios as appropriate. The proposed change to the decks on the north side of the house result in a net decrease in impervious surface within the buffer. Therefore, ECDC 23.50.040.I and 23.90.040.D.4 do not 9505 191h Avenue SE, Suite 106, Everett, WA 98208 425.337.3174 www.wetiandresources.com a +]�,— i'dU� apply. No new development is proposed in the existing footprint within the wetland/stream buffer. Therefore, ECDC 23.50.040;J and 23.90.040.D.5 do not apply. e. Per ECDC 23.50.040.G.5.d, stormwater outfalls are only allowed in the outer 25% of a standard or modified wetland buffer. Please revise the location of the out all shown on Appendix D accordingly. The stormwater plan has been changed to direct stormwater down Homeland Drive to the storm system at 51h Avenue South. Under the new site plan, no outfall is proposed within the on -site buffer. f. In accordance with ECDC' 23.40.130, the monitoring plan must befor 5years with progress reports due at 1, 3 and 5years. Update as appropriate, considering any changes that may result in the mitigation ratios described above. The monitoring plan has been updated to include five years of monitoring (see Section 5.0 of the revised Critical Areas Report and Buffer Enhancement Plan — Revision 1 (Wetland Resources, Inc., dated January 25, 2019). Should you have any additional questions or concerns, please do not hesitate to contact me. Wetland Resources, Inc. Joie Goodman Associate Ecologist joie(@,wetlandresources.com wetlandresources.com 425-337-3174 Welland Resources, Inc. 2 515 Homeland Drive January 25, 2019 WRI # 18200