014330
ENVIRONMENTAL CHECKLIST FORM
0
I. BACKGROUND
;.
1.
Name of Proponent: Han Z Park & Jerome R. Poiner
2.
Address and Phone Num er of Proponent:i,
18314 Olympic View Dr., Edmonds,WA 774-6989
li
=;
18213 - 80th Ave. W., Edmonds, WA 778-8306
)
3•
Date Sec ] i s t Submil tte
April 18, .1979
4.
Agency Requiring Checklist: '
Edmonds Planning De artment
5.
Name of Proposal, if applicable:
Han Park
6.
Nature and Brief Description of the Proposal including but not
limited to its size, general design elements, and other factors
that will give an accurate understanding of its scope and nature):'
This proposal is to subdivide 5.7 acres into 8 building sites, 3
existing residences are already within the proposed development. This
s
ro osa is designed o wor i hin exis i r
7.
Location of Proposal escri e t e p ysica setting of t e pro-
a
,,
posal, as well as the extent of the land area affected by any
t
':
environmental impacts, including any other information needed to
,
give an accurate understanding of the environmental setting of the
c'
proposal):. The property is loc. on the west side of Beverly Park -Edmonds Road
t
NE of 76th Ave. W. (Perrinvi l le) & east of 80th Ave. W. The physi_ca,l,'setting i.ss
in a semi -natural state in that 3 res. presently exist on site w/steep banks
,
adjacent to Beverly Park-Edm. Road. The Property -Is mainly covered w/a few fir'
and cedar on steep banks w/fern & salal & alder 6 scrub plant growth on the
upper plateau areas in proposed building site locations.
8.
Estimated Date for Completion of the Proposal:
June, 1980 (1 year)