01438LIA
Yes Maybe No
Natural Resources. Will the proposal result in:
(a) Increase in the rate of use of any natural
resources? X
(b) Depletion of any nonrenewable natural
resource? X
Explanation: Domestic water, electricity_ and materials for home`''
construction will be consumed by the nature of the development and r~'`
will increase the use of materials of the Puget Sound area. No non- -
renewable natural resources are known to exist on the site except-
-the land.
Risk of Upset. Does the proposal involve a
risk of an explosion or the release of hazard-
ous substances (including, but not limited to,
oil, pesticides, chemicals or radiation) in
the event of an accident or upset conditions?
'ts
r
;
X
Explanation: Limited to potential construction accidents.
J
s ?!
S'
Population. Will the proposal alter the
location, distribution, density,•or growth
rate of the human population of an area: X
Explanation: 15 families or approximately 18 peODle will inhabit
the new residences generated by this proposal.
(12) Housing. Will the proposal affect existing
housing, or create a demand for additional
housing? X
Explanation: 5 new homes will be -available -to house 5 families,
The creation of these new homes will not create a demand for
additional housing.
i