Loading...
0144_001.pdfne OMEGA ENGINEERING INC. January 23, 2019 City of Edmonds Engineering Division JoAnne Zulauf Zachary Richardson RE: Plan Review Comments — Dolan Addition BLD20180613 Dear Staff, 2707 Wetmore Avenue Everett, WA 08201 t 425.387.3820 f 425.259_1958 This letter is intended to summarize the changes made to the engineering package based on the comments the City provided in their comment documents dated 11/21/18. This letter addresses comments from the Engineering Division which were provided via email. I have tried to format this letter to match the comment letter for easier understanding. Review Comments: 1. a. No new comment or request for information. b. The updated drainage report walks through each of the BMPs included in the City of Edmonds Addendum — Appendix A. In Section 7 of the drainage report each BMP is discussed regarding feasibility. The list of BMPs was kept in the same order as those provided in the Addendum and the first BMP that was determined to be feasible was selected and implemented and any BMPs below that item in the list were not considered since a higher BMP must be utilized if deemed feasible and no further mitigation is required for that surface. Detention would be feasible for this project but since higher BMPs on the list have been utilized detention is not selected for this project. Once a surface is mitigated using the highest available BMP on the list no further mitigation is required and no further consideration of lower BMPs is justified. 2. a. & b. Notes have been added to the plans to connect all existing and proposed roof downspouts to the perforated stubout connection proposed for this project. 9. The drainage design for this project no longer proposes discharging runoff to the toe of the slope north of the SFR but rather will utilize a perforated stubout connection for roof runoff and sheet flow dispersion for driveway runoff that is then collected by a shallow ditch/swale and connected to a yard drain. All runoff is then conveyed to the new storm RESUB JAN [ 8 2019 OMEGA ENGINEERING, INC. 2707 Wetmore Avenue Everett, WA 98209 t 425.387.3820 f 425.259.1958 conveyance system within the Homeland Dr R/W. Therefore, a floatable separator is not necessary for the selected BMPs and discharge location. 10. The dispersion tee has been removed from this design. Thank you for taking the time to review the revised plans and report for this project. Please feel free to contact me with any questions you may have. Sincerely, Joseph Smeby, P.E.