01442PROJE DAME -Han Park
DATE. SUBIMITTED Apri 1 18, 1979
ENVIR0,11HENTAL ASSESSMENT
In order to meet the requirements of the State Environmental Policy Act'of 1971,
the responsible official must make a declaration of environmental impact as early
as possible in the process of evaluating a project.
The information in this form :.rill be used to determine whether it will be necess-
ary -to require an environmental impact statenent. If an impact statement is
not required, a Statement of ilegati ve Decl arWt on will be placed in the file.
If an impact statement is required, a draft statement must be filed with this
office, public notice given and a revica period of 30 days allowed. The final
statement and coinnents must be filed with the Department of Ecology, Office of
the Governor and tare Ecological Commission.
The Edmonds Planning Staff will assist you in any way we can in accumulating
this information and are would appreciate your cooperation.
1. Land:
Area in acres 5.7 ac.
Soils type Alderwood L..,...-.` Limitations Topography
Description of topography (% slope) Site topography in proposed building areas
8-10% easterly then 48 to 54% on sloped area east to Beverly Park - Edmonds Road
9
Grading: estimated cubic yds. 200 yds NOTE: If grading or filling
aji]T exceed 500 cubic yards
Filling: estimated cubic yds. 100 yds a grading and filling plan
must be submitted aai th the
2. dater: application.
Stream - estimated fl6w (cubic feet per second) N/A
Will stream be altered? N/A
7o what degree? N/A -
Impact on storm drainage (increase in run-off) Will not increase -runoff
because of design of storm water detention system
Estimated area to be paved
!an
T
Estimated area in open space 70 %
Shorelines: within 200 ft. of Mean Higher High hater N/A