Loading...
01503C.00?'K LIST OF ENGINEERING REQUIREtos FOR SUBDIVISIONS Name Try ve Fiksdal Condominium Plat - File Nod P-6-66 J^•`•� Oc ober 19 966 - STREETS AND ACCESS 1. Right-of-way Requirements: Set back from 196th Street S.W. 25 feet to provide for future 80=foot right-of-way. ! 2. Road Bad Width: 3. Turn Around: r 4. Sidewalks: Curbs, gutters and sidewalks will be provided in accordance with city standards adjacent to property on the west side of MaplewoodRoad. 5. Parking Strip: 6 �. 6 Dedication: 7. Access Easements: 50-foot access road on south boundary of condominium be indicated as a portion of the -condominium plat. i UTILITIES t 1. Water Mains: Connect to water mains in city right-of-way. a. I a. Size Mains:. b. Fire Hydrants: Provide a fire hydrant adjacent to condominium. 2. Sewers or Septic Tanks: Connect to city sewer available in 196th and 88th or Maplewood Road. 3. Drainage: Install all necessary storm sewers and drainage facilities per drainage plan. Where drainage is across adjacent private property, necessary release of damages or release of drainage easements must be furnished. Any drainage problems created by change of contour during plat development must be corrected prior to plat approval or release of plat bond. Final approval of plat (or release of plat bond) will be withheld until actual drainage as installed has been inspected by the City Engineer. 4. Utility Easements: j TOPOGRAPHY i i i City Engineer