Loading...
01528y\ . Name STREETS AND ACCESS 2. Fire Hydrants: One fire hydrant required. 3. Sewers or Septic Tanks: Sewer and septic tank requirements to be determined on submission of percolation test on each lot. Dry sewers will be required. 4. Drainage: Install all necessary storm sewers and drainage facilities per drainage plan. Where drainage is across adjacent private property$ necessary release of datr,sges or release of drainage easements must be furnished. Any drainage problems created by change of contour during plat development must be corrected prior to plat approval or release of plat bond. Final approval of plat (or release of plat bond) will be withheld until actual drainage as installed has been inspected by the City Engineer.