Loading...
01530CITY OF EDMONDS PROJECT NAME Edmonds ENVIRONMENTAL ASSESSMENT DATE SUBMITTED February 26, 1980 The information on this form will be used to determine the effect of your action upon the environment of the City of Edmonds. Please answer each question as thoroughly as possible. 1. LAND Everet gravely 8% - 13% moderate Area 115,957 Soils Type Sandy loam Limitations 14% severe Description of topography (% slope) 11% - 42% NOTE: If grading or filling will Grading:Estimated cubic yards 500 exceed 500 cubic yards a grading y and filling plan must be sub-. Filling:.Estimated cubic yards 500 mitted with the application. Estimated area to be paved (including buildings)22,648 sq. ft. (19 5% gross area) t Estimated area in open space (pervious surface) 84 643 s . ft. 73% gross area 2. WATER open space (mixed surfaces) 8,666 sq. ft.. 7.5%.gross area 1t Stream - Estimated flow (cubic feet per second) G z J , Will stream be altered? .NO If yes, to what degree? N/A Other water bodies? NONE Impact on storm drainage minimal to none Method of handling runoff oil & silt seperationj Adjacent to shorelines zone? NO Within 200 feet of MHHW? NO 3. VEGETATION Type and approximate number of trees 82 Cedar, Hemlock, Fir, Maple (12" dia & over) Minimum diameter of trees to remain 12" dia % of trees to be removed 35% Sword Fern Snow BerTT Ground cover Salmon Rerry Wild grass % to be removed 19 S% Proposed landscaping, if any See attached plan 4. EXISTING LAND USE WITHIN 300 FEET RADIUS OF PROPOSED DEVELOPMENT: Single Multi - Vacant Family Family Commercial Other Development 5. CIRCULATION Estimated increase in auto trips daily 36 Availability of public transportation None 6. AREA OF IMPACT Neighborhood X City-wide Regional 7. EFFECT ON AIR QUALITY None S. CHANGES IN NOISE GENERATION. Nonp