01558MIA
g,
ENGINEERING REQUIREMENTS FOR PLATS PRIOR TO W/BLDG. BOND
AND SUBDIVISIONS RECORDING ("4"PERMIT POSTED COMPLETED
2. Excavation and Grading: Exca- 12.
vation and Grading shall conform
to the requirements outlined in
Chapter 70 of the Uniform Building
Code. Grading plan to be required
X
13. Public Improvements Bond (see 13..
page three) letter required by
X
21 days after preliminary City Council App-oval
fa
1.4.. Monuments (Per Section 12.10.120)
Install in cul-de-sac and at 14.
intersection of 2nd and Elm.
X
L 51. As-Builtse 15.
For all Public Improvements,
X
.6. 2.2% Inspection fee 16.
Based on cost of Public Improvements
Xsn
ADDITIONAL REQUIREMENTS COMMENTS:
Approved legals for each lot a.
X
required
Approved Plat required showing b.
lots, easements, section, town-
ship & range, etc.
X
Question Does applicant desire amendmentF-
to O.S.M. and vacation of 1st Ave?
d.
e.
-A(e c-
rPW ENG ER OF EDMONDS
)UBLIC WORKS DEPARTMENT, ENGINEERING DIVISION
The Engineering requirements have been completed and the subdivision
can be recorded.
uthroized for recording by: Date:
IA"