Loading...
01558MIA g, ENGINEERING REQUIREMENTS FOR PLATS PRIOR TO W/BLDG. BOND AND SUBDIVISIONS RECORDING ("4"PERMIT POSTED COMPLETED 2. Excavation and Grading: Exca- 12. vation and Grading shall conform to the requirements outlined in Chapter 70 of the Uniform Building Code. Grading plan to be required X 13. Public Improvements Bond (see 13.. page three) letter required by X 21 days after preliminary City Council App-oval fa 1.4.. Monuments (Per Section 12.10.120) Install in cul-de-sac and at 14. intersection of 2nd and Elm. X L 51. As-Builtse 15. For all Public Improvements, X .6. 2.2% Inspection fee 16. Based on cost of Public Improvements Xsn ADDITIONAL REQUIREMENTS COMMENTS: Approved legals for each lot a. X required Approved Plat required showing b. lots, easements, section, town- ship & range, etc. X Question Does applicant desire amendmentF- to O.S.M. and vacation of 1st Ave? d. e. -A(e c- rPW ENG ER OF EDMONDS )UBLIC WORKS DEPARTMENT, ENGINEERING DIVISION The Engineering requirements have been completed and the subdivision can be recorded. uthroized for recording by: Date: IA"