01568W
i' L .ERING REQUIREMLNTS FOR SUHDI` _ _ _JNS
Name Talbot View File Pio. P-L- 67
2. Fire Hy?�2a-ats: None required,
3. Sewers cz- Septic Tanks: Soils are acceptable for septic drainfields.
4. Drainage: Install all necessary storm sewers and drainage facilities per
drainago plan. There drainage is across adjacent private property, necessary
release of daT.3ges or release of drainage easements must be furnished. Any
drainage problems created by change of contour during plat development must be
corrected prior to plat approval or release of plat bond. Final approval of plat
(or release of plat bond) will be withheld until actual drainage as installed has
been inspected by the City Engineer.