RE: Select Homes Inc., Lot 2— 7904 203rd St SW SFR
Plan Check BLD 20181577
BLD 15t Review Comment Response
RAM Job No. 17-033
Dear Staff:
This letter outlines the revisions and corrections made per the review comments dated January 2, 2019
and December 10, 2018. Below is a list of the comment response documents addressing the comments
and requests:
Planning Comments, Amber Groll January 7, 2019:
1. Lot Coverage:
a. Lot coverage is defined as the total ground coverage of all buildings or structures on
a site measured from the outside of external walls or supporting members excluding
a maximum of 30' of eaves. Please provide the lot coverage calculations on the site
plan, including the footprint of the entire residence, covered patios, upper floor
cantilevers, and bump outs.
Response: Lot coverage calculations updated as requested.
Engineering Comments, JoAnne Zulauf, December 10, 2018:
GENERAL
1) Submit RO%N' Permit Application form
Response: ROW permit application attached.
2) Submit Side Sewer fennit Application form
Response: Side sewer permit application attached.
3) A Storm%% ater Covenant is required to be recorded against the property bascd on the
proposed stormwater facilities for the project. Please complete the covenant, including
notarization and any required exhibits and submit to the city. Ensure the stormwater
covenant mects Snohomish County Record Drawing requirements. The document must be
complete, but will not be recorded prior to permit issuance. Prior to construction, final
location of facilities are to be verified (by field inspection and asbuilt) and then the covenant
will be recorded.
Response: Stormwater Covenant attached.
WATER
A) Please call outsize of water meter.
Response: 1" water meter size call -out added to sheet 1.
RAM Engineering 1653113`"Ave W,Suite A108 Lynnwood WA 98037
JAN 2 9 2019
F _III i • Ir - _. _ .. .
(425) 678-6960 RAM engineeringinc. corn
Select Homes Inc., Lot 2— 7904 203rd St SW SFR
Plan Check BLD 20181577
BLD 1st Review Comment Response
Page 2 of 2
STORM
5) Please show the perforated stub out area on the plan sheet to connect the stub and the roof
drains.
Response: Perforated stub out area added as requested to sheet 1.
6) Call out the rest of the road surface for this lot. Add the impervious surface into the
calculations.
Response: Impervious surface areas updated as requested on sheet 1.
If there are any questions regarding the items above, please contact me at your earliest convenience; I
can be reached at (425)678-6960 or RobL@RAMengineeringinc.com.
Thank you,
Rob Long, PE
Principal
RAM Engineering 165311311 Ave W, Suite A108 Lynnwood WA 98037 (425)678-6960 RAMengineeringinc.com