01579CHECK LIST OF ENGINEERING REQUIREMENTS
=_a FOR SUBDIVISIONS
Dane File No.
-r
Date
STREETS AND ACCESS
1. Right-of-way Requirements and Dedication:
5�>✓60� �F�ic -r���J 'es:�t�r�' to 6 ?�Gr3o7
2. Turn Around:
FAQ vie,"It3 DRIV�''WA� 7o La'r'
3. Access Easements: ,
ND dl11W f Gb?' ;Ti-;=/1-5 dWAIWeSll11' of Zp At 044l '
UTILITIES AND EASEMENTS
1. Water Mains:
j
2. Utility Easements:
p [' � 1g'fGG f /,�,.� ,: r�`}:� vtr'" � s:,�i t% z c e. tc �'T� PX:a �'f•x � ;� "'� E'�,a.;�': �
3. Sewers or Septic Tanks:
Co�l�lGc1'104 rto s�W&� s R�t�v►���
4. Drainage: Install all necessary storm sewers and drainage facilities per
drainage plan.. Where drainage is across adjacent private property, all parties
having any ownership interest in the lands being platted shall provide, as a
restriction on the plat running with the.land, that the City of Edmonds shall
` be held harmless from any and all claims for damages which may be occasioned
to adjacent land by reason of the construction and operation of the drainage
system, unless, releases of damages and/or drainage easements are obtained from
the other property owners affected by said drainage. Any drainage problems created
by change of contour during plat development must be corrected prior to plat
approval or release of plat bond. Final approval of plat (or release of plat
bond) will be withheld until actual drainage as installed has been inspected by
the City Engineer.
,
,�. UrJDePsepulasD Pat dRp>10"Cc 136
GENERAL NOTES
City Engineer