Loading...
01579CHECK LIST OF ENGINEERING REQUIREMENTS =_a FOR SUBDIVISIONS Dane File No. -r Date STREETS AND ACCESS 1. Right-of-way Requirements and Dedication: 5�>✓60� �F�ic -r���J 'es:�t�r�' to 6 ?�Gr3o7 2. Turn Around: FAQ vie,"It3 DRIV�''WA� 7o La'r' 3. Access Easements: , ND dl11W f Gb?' ;Ti-;=/1-5 dWAIWeSll11' of Zp At 044l ' UTILITIES AND EASEMENTS 1. Water Mains: j 2. Utility Easements: p [' � 1g'fGG f /,�,.� ,: r�`}:� vtr'" � s:,�i t% z c e. tc �'T� PX:a �'f•x � ;� "'� E'�,a.;�': � 3. Sewers or Septic Tanks: Co�l�lGc1'104 rto s�W&� s R�t�v►��� 4. Drainage: Install all necessary storm sewers and drainage facilities per drainage plan.. Where drainage is across adjacent private property, all parties having any ownership interest in the lands being platted shall provide, as a restriction on the plat running with the.land, that the City of Edmonds shall ` be held harmless from any and all claims for damages which may be occasioned to adjacent land by reason of the construction and operation of the drainage system, unless, releases of damages and/or drainage easements are obtained from the other property owners affected by said drainage. Any drainage problems created by change of contour during plat development must be corrected prior to plat approval or release of plat bond. Final approval of plat (or release of plat bond) will be withheld until actual drainage as installed has been inspected by the City Engineer. , ,�. UrJDePsepulasD Pat dRp>10"Cc 136 GENERAL NOTES City Engineer