Loading...
01591e Y 1 • �• DOWN SLOPE EXTERIOR WAIL IMPERVIOUS C P DMIP ROOFING a! s DRAINAGE SAND AND GRAVEL(18 INCHES) FLOOR SLAB COMPACTED BACKFILL ! VAPOR BARRLER LEVELING COURSE WITH SAND AND GRAVEL WEEP HOLE/3' :! • (1" DIA) .AP .yVA 12" COVE • • ,• • o a • • . 6" MIN. 4" BEDDI •i. •"i • 6" 'MIN. PEA GRAVEL PERFORATED PIPE WITH 4" MIN. DIA. WRAP WITH FILTER FABRIC GALE ICE 1. BACKFILL SHOULD BE COMPACTED IN ACCORDANCE WITH COMPACTION STANDARDS SPECIFIED IN THE PROJECT. 2. DRAINAGE SAND AND GRAVEL SHOULD BE UNIFORMLY GRADED AND FREE FROM FINES. 3. PERFORATED LINE SHOULD BE COVERED WITH PEA -GRAVEL OR SHOULD BE WRAPPED WITH FILTER FABRIC. 4. PERFORATED LINE SHOULD BE DAYLIGHTED AND SLOPED AT LEAST 4 INCH PER 100 FEET. 5. DAMP PROOFING SHOULD BE PROTECTED FROM SCRATCHING DURING BACKFILLING PROCEDURE. FT f;l 1pF q SA HONG CONSLIJINr ENGINEERS 17809 65TH PLACE, W. LYNNWOOD, WASHINGTON 98036 (206)-743-4774