016357-
OtAENT 0,
Jpm
.01
tr
7. DEF,A-rMENT OF HOUSING ANb,URBAN I)LVELOPMENT
FEDERAL HOUSING, ADMINISTFZATION
Room 203, Areade Plaza Bul Irlint,
1321 Second A%,ellLIC
Seattic!, Washington 98101
March 18, 1970
OFFICE OF THE DIRECTOR IN REPLY REFER TOt
(Date) W. P, Flaiiing
Subdivision Appraiser;�
Phone: 583-7560
Re: FEASIBILITY ANALY S
Subdivision Name: HERBY HILL MANOR
ti;;
Midtown Construction Co., Inc. Location: Edmonds Snoho— o. Wa.
23207 55th West
Mountlake Terrace, Washington FHA File No.: 317
98043
EMQ- Gentlemen:
7
Our analysis of your application for Subdivision Feasibility
shows that your pr6ject is feasible. The Veterans, Administration-:
agrees,
If you intend to proceed with FHA processing of your development,-•
please prepare and submit a complete pre -construction exhibit pack-
age as requested on the attached check list, FHA Form No. 2296.
If your development -involves site grading under Data Sheet 7913',' you
4
may begin the grading subject to the following conditions:
1) You must notify FHA verbally or in writing at least
three days before you begin work.
2) You must agree -not to.install any site improvements
until FHA accepts your final neighborhood grading and
drainage plan.
This completes Stage I of FHA processing. Applications for mortgage
insurance may be submitted after FHA acceptance of pre -construction
exhibits.
Following are the modifications of your proposal that we agreed to
in our conference on
This feasibility approval is void if satisfactory compliance is not
demonstrated in sixty (lays.
cc: Veterans Administration
Edmonds Planning Commission 5•;
Attachments
229624-P
fDirector
HUD-Wosh., D. C.