Loading...
01696Y r f� ECEWFED NOV 5 1960 Cosy ui Edmond Commumiy Devel. Dept. November 5, 1980 MEMO TO: Planning Department FROM: Engineering Division SUBJECT.; ENGINEERING COMMENTS FOR THE NOVEMBER 12,1980 PLANNING COMMISSION MEETING The Engineering Division'of Public Works has the following comments to of- fer pertaining to the hearings scheduled for the November.12, 1980 Plan- ning Commission meeting: CONTINUED AGENDA SM-3-80 CITY OF EDMONDS - Shoreline Management Permit for the develop- ment of Union Oil Park located at the southern terminus of Union Oil Park at the south end of Admiral Way within Govern- ment Lot 1 and of Tideland, Lot 1, in Section 26, Township 27 North, Range 3 East W.M. CONTINUED FROM OCTOBER 22, 1980. Engineering has no objection. AGENDA SM-4-80 CITY OF EDMONDS - Shoreline Management Permit for the develop- ment of waterfront improvement program at the western terminus of Dayton Street and Union Oil Marsh. Engineering has no objection. PRQ-3-80` PETER BILDER - .Fifteenuni.t planned` residential development° at nd',Street SA* (.RS-12): The data submitted is good for cursory conceptual review only. Additional'*data will be required for further preliminary review. The fol- lowing are preliminary engineering requirements and comments )nly: 1) A 10 foot right-of-way dedication will be required along Meadowdale Beach Road and along 72nd Ave. W. per O.F.S.M. 2) A minimum of 22 feet of pavement is required if a private road. Turnaround on site is required. 3) Concrete curbs and gutters with.a,5' concrete sidewalk will also be required.