Loading...
02.06.2013-Litchfield Response Comments[1].pdfLITCHFIELD ENGINEERING Civil Engineering & Development Services 12840 81" Ayenue NE, Kirkland, WA 98034 tel 425-821-5038 fast 425-821-5' 39 ka.iitchfield@frontier.com February 6, 2013 City of Edmonds Engineering Division 121 5"' Avenue N. Edmonds, WA 98020 Attention: Jeanie McConnel, Engineering Program Manager Michael Clugston, Associate Planner q s` Subject: Engineering Plan Revisions ,= fia Linehan 2 -lot Short Plat 3j: Project Address: 7330 208th St. SW Dear Ms. McConnel: In response to your November 7, 2012 letter, I have completed revisions to the Linehan Short Plat. For your use and review I have enclosed 3 copies of the revised plans. The following is a description of the pian revisions using the same numerical designation as used in your letter. Please refer to your earlier letter for details of each comment. General: Please see the attached Engineers Estimate prepared using the King County Site Improvement Bond Quantity Worksheet. • The project developer and/or his builder will post the required bond for the erosion control and public right-of-way improvements. ® The owner/builder will be responsible for the project's bonding/inspection fees 2. The City file number has been added to Sheet I as requested. 3. A note has been added to Sheet 1 as requested. 4. a. There is not enough elevation difference across the project site to provide finish grade contours as requested. Spot elevations have been provided on Sheet 3 to control finish grade elevations for the road and driveway improvements. b. The plan sheet 3 of 4 is retitled to reflect the fact that it shows Utility elements as well as the Frontage Improvements. c. The Frontage Improvements are shown on the same plan sheet as the utilities and therefore does not need a separate sheet. The 0 plan sheet shows the details required to construct both the utilities and frontage improvements. d. The Traffic Control and Haul Route plan will be submitted for approval by the general contractor prior to the preconstauction conference. 5. The property line setbacks have been reviewed and approved by the City planning department staff. Jeanie McConnel — City of Edmonds Page 2 February 5, 2013 6. Tandem parking spaces arrangement for two vehicles as allowed for a single-family residence in the ISM zone is shown for Lot A. Parking for Lot P as depicted will also bee reflected on the building permit site plan for Lot B. 7. Note 1 now references the 2012 WSDOT standards. 8. Note number 15 is now crossed through indicating it is N/A for this project. 9. A list of utility purveyors is provided on the cover sheet. TESC/Grading Plan Sheet: 1. Note "J" now references the City of Edmonds standards. 2. Note number 9 no longer has the word "denuded". 3. Note number 15, 19 and 24 are now crossed through indicating that these notes are not applicable to this project. 4. Note 22 now only references a "filter sock". 5. The words "as needed" have been removed from the drawing notes. 6. The City standard detail E1-2 "Stabilized Construction Entrance" is provided on this sheet. 7. The City standard handout E72C for compost amendment of disturbed soils has been reference as Note 15 of the construction sequence. Frontage Improvement & Utility Plan Sheete 1. The inspection notes have been deleted from this sheet. 2. Site and Frontage improvement notes have been revised based on comments. 3. The plans currently reflect the removal of rockeries within the City right-of-way. Concrete retaining walls are shown on the plan and the cross section. Although none are anticipated, walls over 4' in height will be designed by a structural engineer. It should be noted that given the site grades no walls are expected to be over 30" in height. 4. The typical cross section for 74th Avenue West has been revised. 5. Fences to be removed shall be relocated to the property line or permits will be obtained. 6. The existing pavement centerline delineators are shown on 74th Avenue W. 7. The existing pavement marking for the crosswalk are shown as requested. 8. The existing house is to remain and is noted. 9. The removal of the covered patio is noted. 10. The removal of the curb along 208th Street has been noted on the plans as being subject to a determination by the engineering inspector. 11. The 2' sawcut and ACP removal in areas of curb and gutter removal or new curb and gutter construction is shown in the street cross section and the plan view. 12. Sawcut limits and trench patching/ACP replacement has been shown. 13. A note has been added on sheet 3 stating that compaction test reports will be provided to the City prior to any paving. Jeanie McCom el — City of Edmonds Page 3 February 6, 2013 14. References to standard details have been provided as requested. 15. Driveway curb cuts have been shown at the locations of which they will be needed. 16. The plan and notes indicate which utilities will be installed at the time of short plat improvements, 17. Sewer Utility comments have been addressed using new "Sewer Notes" on this sheet. 18. Water Utility comments have been addressed. 19. Stormwater Utility comments have been addressed. The soil analysis fiom Associated Earth Sciences is attached as requested. I am hopeful that the above comments and enclosures are sufficient for you to complete your final review and project approval will be forthcoming in the near future. I thank you in advance for the time that you have committed to this project. Sincerely, Litchfield Engineering Keith A. Litchfield, P.E. Principal Engineer Enclosures: Revised Civil Engineering Plans Dated 2/6/13 Bond Quantity Worksheet Associated Sciences Soil Test Results Copy: Tim Linehan