Loading...
022709_FieldReport_AES.pdfAssociated Earth Sciences, Inc. 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 425-827-7701 FAX 827-5424 TO: Sunset 100 Limited Partnership c/o Real Estate Capital LLC West, Edmonds, WA 98026 16118 72� ATTN: Mr. John Thorsen AS REQUESTED BY Mr. Duane Landsverk THE FOLL0WfNG WAS NOTED: Page I of I Date Project Name Project No. 2-27_09 'unset 121 KE080122B Location weathel, 121 Sunset Ave, Edmonds, WA Stniny, 50's municipality Report Number City of Edmonds 4 En gineer/Architect. C & G Enginecring Client/Owner SUSE'r 100 Limited Partnership General Contractor/Superintendent Duane Landsverk Grading CoiitractOl-ISLIpei-iiiteiideiit AESI arrived on site as part of ongoing construction monitoring. Since our last visit, AESI observed that the contractor has placed additional plastic sheeting extending out over the property boundary and into the right of way along the eastern property boundary. The plastic sheeting covers aggregate that was placed below a section of ripped out sidewalk and is secured with sandbags, The contractor has also completed the removal of organic topsoil that had been stockpiled on site and drum rolled exposed soils across the majority oftheproperty. At the time of our visit, it does not appear that the contractor has trimmed the slopes along the eastern property boundary, as discussed in DFR #3, At the time of our visit, the slopes remain covered with plastic sheeting and secured with sandbags as part of ongoing erosion control BMPs. It is recommended that the BMP's continue being implemented until such time as the contractor elects to trim the slope as part of site development, AESI will return as directed by the contractor as part of our construction monitoring services, COPIES TO: D AT :I - MAILED: MAR 2 3 2009 RECEIVED MAR 2 5 2009 ENGINEERING DIVISION FIELD REP.: Ed Garc) PRINCIPAL i PM: