Loading...
0273_001.pdfC C CONSTRUCTION 8415 192NDSt SW, Edmonds, WA 98026 carclp@comcast.net 2/13/2019 City of Edmonds Environmental Programs Manager Kernen Lien RE: Vector One LLC SUBJECT: Plan Checkā€”BLD2018-1030 Geotechnical Report: Not addressed at this time. Native Vegetation Plan: See new TESC plan and new site plan provided by Omega Engineering. Height Calculations: Please see corrected elevations page one of house plans. Thank you, Carl Clapp C C CONSTRUCTION CITY OF EDMONDS Y J PLAN REVIEW COMMENTS PLANNING DIVISION 425.771.0220 DATE: August 31, 2018 TO: Matt Bolin Vector One LLC mbolin@vsacmte.com FROM: Kernen Lien, Environmental Programs Manager kernen.lien Pedmondswa.eov RE: Plan Check BLD20181030 8364 Olympic View Drive New Single Family Residence On behalf of the Planning Division, I have reviewed the above building permit application. During review of the subject submittal, it was found that the following information, corrections, or clarifications need to be addressed. Please respond to the following items, so that I can complete my review: 1. Geotechnical Report: A geotechnical report and addendums were completed in conjunction with the short plat for the subject property (PLN20120021), but none specifically review the proposed residence. Please provide a geotechnical addendum that specifically reviews the proposed residence and the required findings in ECDC 23.80.060.A and ECDC 23.80.070. 2. Native Vegetation Plan: Please identify the boundaries of the native vegetation area on the site plan. It is difficult to determine the houses location in relation to the native vegetation area. 3. Height: Please verify the height limits identified on the elevation plans. The indicated heights to not scale appropriately. The distance from the average grade (281) to the maximum allowable height (306) scales out to 22.5 feet at the locations indicated on the plan (should scale to 25 feet). The overall distance from EF 274 to the maximum allowable height of 306 would be 32 feet, but this distance scales to 29.5 on the elevation views. Please make all submittals to a Development Services Permit Coordinator, Monday, Tuesday, Thursday, and Friday between 8:00 am 4:30 pm or Wednesday 8:30 am to 12:00 pm.