Loading...
03.12.2013-Compliance Letter-.pdf CITY OF EDMONDS DAVE EARLING MAYOR TH 121 5AVENUE NORTH EDMONDS, WA 98020425-771-0220FAX 425-672-5750 · · · Website: www.edmondswa.gov PUBLIC WORKS DEPARTMENT Engineering Division March 12, 2013 Yeriel LLC –DBA Kero’s Auto Brokers 22324 Highway 99 Edmonds, WA 98026 SUBJECT: Kero’s Auto Brokers, Landscaping and Stormwater Code Compliance Mr. Sharawy, On March 30, 2011, an order to correct violation notice was issued to you requiring permit compliance for the parking lot modification/expansion at 22324 Highway 99. In May 2011 an application was submitted for design review of the parking lot and landscaping. In September 2011 a storm drainage permit was created for review ofthe stormwater detention system that is required to be installed in order to comply with stormwater requirements as a result of the added impervious surface area. The project received Administrative Design Review approval on November 16, 2011 with the following Decision: Based on the findings, conclusions, and attachments to this report, staff finds that the design review for file number PLN20110016 is APPROVEDwith the following conditions: 1. The landscape plan in Attachment 2 date stamped on October 20, 2011 must be implemented as shown on the plans by March 31, 2012. Any changes to the species or sizes of planting must first be approved by the City of Edmonds Planning Division. The Planning Division shall be called for an inspection of the installed landscaping. A maintenance bond for the landscaping is required pursuant to ECDC 20.13.040. An itemized cost estimate covering landscaping and irrigation must be submitted for use in determining the landscape bond amount. The landscape maintenance bond will be 15% of the itemized cost estimate. 2. Any of the existing landscaping along Highway 99 that is disturbed by installation of new drainage infrastructure shall be restored to its current condition. On November 21, 2012 notification was sent to your project permit contact Steve Waite, stating the storm drainage permit would receive approval once the contractor submitted a right-of-way construction permit application and traffic control plan. At this time, the landscape bond and right-of-way construction permit (including traffic control plan) are the last submittal requirements to be addressed. Please provide these items prior to March 27, 2013 to prevent this project file from being turned over to Code Enforcement and incurring any associated fines for failure to comply. Sincerely, Jeanie McConnell Engineering Program Manager c: Kernen Lien, Associate Planner Mike Thies, Code Enforcement Officer Steve Waite –waiteearch@comcast.net