Loading...
0321_001.pdfC � ENGINEERING February 22, 2019 civil & structural engineering & planning Eric Carter, Plans Examiner Building Division 121 5th Ave. N Edmonds, WA 98020 RE: Plan Check: BLD2019-0130 Project Name: Trent Residence Remodel Project Address: 9000 196th ST SW Scope: Alteration SFR, VB construction, Plumbing and Mechanical included. Dear Mr. Carter, Itemized below is our response to the review comments dated February 15, 2019 for the above referenced project. Our response appears in bold. 52.1: 1. The plans indicate detail 4/53.3 is to be applied along the proposed 5 %"x14PSL.Page S3.3 was not included with the submittal. Please provide sheet 53.3 or add intended detail to the plans. Please refer to the updated detail 4/54.2 referenced on 52.1. 2. Directive "Dowel and Epoxy threaded rod into existing foundation with Simpson Set-XP and 12" min embed, typical at anchors" is provided and appears to be intended for the required HDU2 anchors has been provided. When referring to the Hold -Down schedule, it appears that a 5/8" threaded rod is to be used with the note 4 providing further direction to detail 6 on 54.1. Detail 6 does not appear to correspond. Please clarify and indicate the intended installation detail on the plans. Please refer to the updated Hold-down Schedule on 53.1. Generic references that don't apply have been removed from the schedule. If you have any questions or comments regarding the responses to this review, please do not hesitate to call. Sincerely, CG Engineering Dennis Titus, PE, SE 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com