Loading...
040909 thru 041409_FieldReport_AES.pdfV VA "I Oki 4 as] MA - I Associated Earth Sciences, Inc. 0 0 Tt %EC4VED 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 425-827-7701 FAX 827-5424 APR 2 3 2009 TO: Sunset 100 Urnited Partner INEERING DIV1,S)ON c/o Real Estate Capital U,C 16118 72 A Avenue West, Edmonds, WA 98026 ATTN: Mr. John Thorsen AS REQUESTED BY Mr. Duane Landsverk THE POLLOWING WAS NOTED Page I of 2 Date Project.Name �unset Project No.,.04-09-09 Embedment 121 KE080112213 Location Weather 121 Sunset Ave, Edmonds, WA 50OF MUniCipality _9vercast, Report NUMI' City of Edmonds 10 Elngineer/Architect 2.76 -.C.&. G Engineering 75 client/owner 24 SUSET 1001 znited Partnership 37 General 3.00 Duane Landsverk 62 Pile Coiitt-actor/SLuI)Cl'illtciideiit 20 McDowell Pile King _/ Matt 32 AESI arrived on site to perform construction monitoring activities associated occurring on site today. Out- presence was requested by Mr. Ron Skinner on behalf of 1,andsverk Quality Homes (I,Qfl) to observe site conditions prior to Auger Cast (AC) pile installation. Atigercast Piles McDowell used a crane with a 70 foot boom able to support the AC pile installation drill with an 18 inch diameter di-iH capable of drilling to a depth of 40 feet, A total of I I AC piles were installed today; all piles were note to be at least 5 pile diameters apart to prevent piles from blowing out into each other. Piles ranged in depth from 27 to 37 feet with embedment depths of 12 to 27 feet. The tipper 15 feet of soil on the site was noted to be loose organic soil and fill that is unsuitable for a typical building foundation. The stable soils below the loose soil consisted of hard silty sand with gravel. Once drilling was complete 4000 psi. concrete was placed through the shaft of the AC pile drill to the bottom of the boring. The piles were installed allowing for 9 to 17 feet of head for the concrete above the base of the drill. Next rebar cages and center bars made of 6 or 8 bar rebar were installed into the borings, 6 bar for 25 foot piles and 8 bar for 30 and 35 foot piles. The center bar extended to the full length of the piles and the rebar cage only extended to a depth of 22.5 feet. See table below for a summary of piles completed today. See page two For a map of the piles completed today, Erosion The contractor has a small section in the northwest corner of the site where the slope to the neighboring property is over - steepened. This section along with all the other slopes have been covered with plastic and no significant changes it) the slope conditions were noted today. Pile# Pump Counts Depth of Bearing Embedment Embedment Spec. Total Depth Concrete Head CY used 74 69 10 27 20 37 10 2.76 73 75 13 24 20 37 10 3.00 72 62 12 20 15 32 10 2.48 53 66 14 18 15 32 12 2.64 3,6 60 15 17 15 32 10 2.407 69 73 13 24 20 37 12 2,92 67 56 13 14 10 27 10 2.24 64 63 53 81 12 14 15 23 10 20 27 37 9 17 2.12 3,24 66 55 15 12 10 27 14 2.20 60 54 14 13 10 27 10 2.16 COPIES TO: FIELD Rr:,P,: Michael Place P.E. DATE APR 2 : Druce Blyton 13, MAILED: PRINCIPAL PMBBlP07... — FIELD REPORT Associated Earth Sciences, Inc. 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 425-827-7701 FAX 827-5424 TO: Sunset 100 Limited Partnership c/o Real Estate Capital LLC 16118 72" Avenue West, Edmonds, WA 98026 — ATTN: Mr. John Thorsen AS REQUESTED BY Mr. Duane Landsverk THE FOLLOWING WAS NOTED: Page 1 of 3 Date I Project Name Project No. 04-10-09 unset 121 KE080122B Loeation weather 121 Sunset Ave, Edmonds, WA Overcast, 500E Municipality Report Numbu City of Edmonds 1 ] Lnoineer/Architect C & G Engineering Client/owner SUSET 100 Limited Partne� Gencral ContractorlSuperintendent Duane Landsverk Pile ConU'aCor/SuperinteFtdent McDowell Pile King I Matt AESI arrived on site to perform construction monitoring activities associated occurring on site today. Our presence was requested by Mr. Ron Skinner on behalf of Landsverk Quality Homes (LQH) to observe site conditions prior to Auger Cast (AC) Pile installation. Augereast Piles McDowell used a crane with a 70 foot boom able to support the AC pile installation drill with an 18 inch diameter drill capable of drilling to a depth of 40 feet, A total of 21 AC piles were installed today; all piles were note to be at least 5 pile diameters apart to prevent piles from blowing out into each other. Piles ranged in depth from 27 to 37 feet with embedment depths of 12 to 23 feet. The upper 11 to 15 feet of soil on the site was noted to be loose organic soil and fill that is unsuitable for a typical building foundation. The stable soils below the loose soil consisted of hard silty sand with gravel. Once drilling was complete 4000 psi concrete was placed through the shaft of the AC pile drill to the bottom of the boring. The piles were installed allowing for 9 to 17 feet of head for the concrete above the base of the drill Next rebar cages and center bars made of 6 or 8 bar rebar were installed into the borings, 6 bar for 25 foot piles and 8 bar for 30 and 35 foot piles. The center bar extended to the full length of the piles and the rebar cage only extended to a depth of 22.5 feet. See table on page two for a summary of piles completed today. Sce page three for a Wrap of the piles completed today. Erosion The contractor has a small section in the northwest corner of the site where the slope to the neighboring property is over - steepened. This section along with all the other slopes have been covered with plastic and no significant changes in the slope conditions were noted today. COPIES TO: FIELD REP DATE PRINCIPAL / PM MAILED: P 7 0 Michael Place P.E. ' Bruce Blyton P.E. , .,. r '(91 KE -080122 4-10-09 page 2 of 3 Pile # Pump Counts Depth of Bearing Embedment Embedment Sec. Total Depth Concrete Head CY Concrete used 62 54 13 14 10 27 10 2.16 58 50 12 14 10 27 10 2.00 56 53 11 16 10 27 10 2.12 57 67 14 18 15 32 15 2.68 40 81 15 22 20 37 13 3.24 55 78 14 23 20 37 15 3.12 39 82 15 22 20 37 11 _ 328 20 84 15 22 20 37 11 3.36 41 61 15 12 10 27 10 2.44 45 64 15 17 15 32 10 2.56 44 76 15 22 20 37 13 _ 3.04 25 65 15 17 15 32 15 2.60 27 81 15 22 20 37 10 3.24 10 73 15 17 15 32 11 16 80 15 17 15 32 11 --2.92 3.20 48 80 15 22 20 37 13 3.20_ 47 56 15 12 10 27 11 51 77 15 22 20 37 13 _2.24 3.08_ 50 71 15 17 15 32 11 2.84 30 59 15 17 15 32 9 2.36 46 51 15 12 10 27 5 _ 2.04 Associated Earth 0 0 911 Fifth. Avenue, Suite 100 Kirkland, Washington 98033 425-827-7701 FAX 827-5424 FIELD REPORT Sciences, Inc. TO: Sunset 100 Limited Partnership n c/o Real Estate Capital LLC 16118 72" Avenue West, Edmonds, WA 98026 ATTN: Mr. John Thorsen AS REQUESTED BY Mr. Duane Landsverk THE FOLLOWING WAS NOTED: Page 1 of 3 Date Project Name Project No. 04-13-09 Sunset 121 KE0801228 Location Weather 121 Sunset Ave, Edmonds, WA Showers, 40°F Municipality Report Number City of Edmonds 12 Engineer/Architect C & G Engineering ClientlOuner SUSE`I' 100 Limited Partnershi General Contractor/Superintendent Duane Landsverk Pile Contractor/Superintendent McDowell Pile Kin / Matt AESI arrived on site to perform construction monitoring activities associated occurring on site today. Our presence was requested by Mr. Ron Skinner on behalf of Landsverk Quality Homes (LQH) to observe site conditions prior to Auger Cast (AC) Pile installation. Augereast Piles McDowell used a crane with a 70 foot boom able to support the AC pile installation drill with an 18 inch diameter drill capable of drilling to a depth of 40 feet. A total of 13 AC piles were installed today; all piles were note to be at least 5 pile diameters apart to prevent piles from blowing out into each other. Piles ranged in depth from 27 to 37 feet with embedment depths of 17 to 22 feet. The upper 15 to 17 feet of soil on the site was noted to be loose organic soil and fill that is unsuitable for a typical building foundation. The stable soils below the loose soil consisted of hard silty sand with gravel. Once drilling was complete 4000 psi concrete was placed through the shaft of the AC pile drill to the bottom of the boring. The piles were installed allowing for 10 to 15 feet of head for the concrete above the base of the drill. Next rebar cages and center bars made of 6 or 8 bar rebar were installed into the borings, 6 bar for 25 foot piles and 8 bar for 30 and 35 foot piles. The center bar extended to the full length of the piles and the rebar cage only extended to a depth of 22.5 feet. Pile operations were halted because the drive chain for the auger broke while attempting to drill pile 38. The final two piles for this job will be completed tomorrow. See table on page two for a suirunary of piles completed today. See page three for a map of the piles completed today. Erosion The contractor has a small section in the northwest corner of the site where the slope to the neighboring property is over - steepened. This section along with all the other slopes have been covered with plastic and no significant changes in the slope conditions were noted today. COPIES TO: FIELD REP.: DATE MAILED: APR 2 9, _?__009- PRINCIPAL I PM Michael Place P.E. Bruce Blyton P.E.��' KE -080122 4-13-09 page 2 of 3 Pile # Pump Counts Depth to Bearing Embedment Embedment See. Total Depth Concrete Head Concrete used {CY) 49 76 15 22 20 37 10 3.26 9 77 1 15 22 20 37 10 3.30 15 58 15 17 15 32 10 2.49 31 69 15 22 20 37 15 2.96 14 71 15 22 20 37 13 3.04 7 63 15 22 20 37 15 2.70 12 63 15 17 15 32 11 2.70 11 60 15 17 15 32 11 2.57 21 71 15 22 20 37 10 3.04 17 63 15 17 15 32 10 2.70 13 61 15 17 15 32 13 2.61 18 62 15 17 15 32 15 2.66 37 74 15 17 15 32 10 3.17 38" - 17 - 15 25 - - * Pile not completed today due to drive chain breaking, * PI(C ak,,5`jcf((e i'Vr�-'ic,Lis Johl 6m I^'� aW ulry d ;- -13= „ -3-13- r FIELD REPORT Associated Earth Sciences, Inc. 0 n N 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 425-827-7701 FAX 827-5424 TO: Sunset 100 Limited Partnership c/o Real Estate Capital LLC 16118 72°° Avenue West, Edmonds, WA 98026 ATTN: Mr. John Thorsen AS REQUESTED BY Mr. Duane Landsverk THE FOLLOWING WAS NOTED: Pape 1 of 2 Date Project dame Project No. 04-14-09 Sunset 121 KE080122B Location Weather 38 Partly Cloudy, 121. Sunset Ave, Edmonds, WA 40O Municipality Report Number City of Edmonds 13 Engineer/Architect 62 C & G Engineering 15 Client/Owner 27 SUSET 100 Limited Partnership 2.66 General Contractor/Superintendent Duane Landsverk Pile Contractor/Superintendent McDowell Pile Kin 1 Matt AESI arrived on site to perform construction monitoring activities associated occurring on site today. Our presence was requested by Mr. Ron Skinner on behalf of Landsverk Quality Homes (LQH) to observe site conditions prior to Auger Cast (AC) Pile installation. Augereast Piles McDowell used a crane with a 70 foot boom able to support the AC pile installation drill with an 18 inch diameter drill capable of drilling to a depth of 40 feet. A total of 2 AC piles were installed today; all piles were note to be at least 5 pile diameters apart to prevent piles from blowing out into each other. Piles ranged in depth from 27 to 37 feet with embedment depths of 12 to 23 feet. The upper 13 to 17 feet of soil on the site was noted to be loose organic soil and fill that is unsuitable for a typical building foundation. The stable soils below the loose soil consisted of hard silty sand with gravel. Once drilling was complete 4000 psi concrete was placed through the shaft of the AC pile drill to the bottom of the boring. The piles were installed allowing for 5 to 10 feet of head for the concrete above the base of the drill. Next rebar cages and center bars made of 6 or 8 bar rebar were installed into the borings, 6 bar for 25 foot piles and 8 bar for 30 and 35 foot piles. The center bar extended to the full length of the piles and the rebar cage only extended to a depth of 22.5 feet. See table below for a summary of piles completed today. See page two for a map of the piles completed today. Erosion The contractor has a small section in the northwest corner of the site where the slope to the neighboring property is over - steepened. This section along with all the other slopes have been covered with plastic and no significant changes in the slope conditions were noted today. Pile # Pump Counts Depth to Bearing Embedment Embedment Sec. Total Depth Concrete Head Concrete used (CY) 38 61 17 15 15 32 5 2.61 54 62 13 15 10 27 10 2.66 COPIES TO: DATE MAILED: APR 2 9, ?009 FIELD REP.: Michael Place P.F. PRINCIPAL / PM: Bruce Blyton P.E. i" r_ r