Loading...
05-136 anglers crossing- electronic gates.doc January 17, 2007 Andy Reeves The McNaughton Group P.O. Box 100 Edmonds, WA. 98020 RE: Angler’s Crossing- Utility placement within the plat right-of-way and Electronic gates (P-05-136/PRD-05-137) Dear Andy: We have looked at your proposed re-configuration of the plat streets and location of the utilities. As previously discussed, we want all the utilities, including the 24”water main and 24” storm line, within said proposed rights-of-way with the proper clearances (including thrust blocks). If you would like to swing by, I can show you what we have come up with as far as utility location for the utilities that have to be rerouted. In our last meeting, Kevin indicated they were looking at electronically controlled bollards for the emergency access road. However, since they are not easily nor rapidly defeatable, the Fire Department wants to see opticom operated type gates installed across the access road. When the Homeowner’s Association documents are written up, it must include language that states the maintenance of the gates shall be the sole responsibility of the homeowner’s association and should the gates fail to be maintained or operate correctly, the gates shall remain open until the gates are returned to proper operating condition. Sincerely, Lyle Chrisman Engineering Program Manager Cc: Steve Bullock, Senior Planner Noel Miller, Public Works Director C:\\Users\\cockrum\\AppData\\Local\\Temp\\05-136 anglers crossing- electronic gates.doc_153701\\05-136 anglers crossing- electronic gates.doc