Loading...
05-140 mize-yokey rev2 20060816092105.pdfSTORM DRAINAGE ANALYSIS Date: July 25, 2006 Prepared for MIZE & YOCKEY RESIDENCE 22604 95th PL SW Edmonds, Washington Project No. S-06-140 Prepared by MRK ENGINEERING PLLC 14218 -SE 10th Street Bellevue, WA 98007 (206) 799-1379 34878 0 ISTE �SSIONAL S EXPIRES DECEMBER 02, 2006 P -J POST—DEVELOPMENTAL FLOWS Summary of Hydrological Parameters for Proposed Project Area: LAND COVER Lawn, Landscaped Areas Impervious (asphalt, cone., roof top) Total AREA IN ACRES 0.235 0.179 0.414 %Impervious surface (Project Site Soil Type Hydrologic Soil Group Time of concentration Onsite/Collection Area: CN VALUE 86 98 33.3 Alderwood 13.2 CONDITION IOYR FLOW 100YR FLOW (CFS) (CFS) Peak runoff rate 0.1182 0.2087 Is] 5. SUMMARY OF FLOW AND PROPOSED TANK PARAMETERS Collection Area: The final allowable discharge rates out of the detention system have been determined. 10 CONDITION 10 -YR FLOW 100 -YR FLOW », r (CFS) (CFS) 0.1182 0.2087 63 Proposed Peak Runoff 3 (onsite) Allowable release rater 0.0231 0.0641, CONTROL STRUCTURE / ORIFICE AND WEA 40 FT. Required tank length Z 30 -inch Required tank Diameter -4 r 7 -i dia. Bottom orifice `� 1.64 -inch dia. Second orifice ((a, 1.86') The required storage quantities shown above we taken from the retults of the RLPool Data computer model runs.