Loading...
05930_Exhibit_writeup.pdf J.C. Mc DONNELL ENGINEERING, P.C. Consulting Civil Engineers th 6608 216Street SW; #306 Mountlake Terrace, WA. 98043 June 29, 2015 Jennifer Lambert Public Work Department th 121 5 Ave N Edmonds, WA 98020 RE: Neuman 390 Sunset Ave N (#BLD20150224) Dear Jennifer, Below is a description of the exhibits provided: EXHIBIT 1 Exhibit 1 delineates the contributing areas to each gravelless chamber. As designed, all The lowest rim ele This allows the system to overflow into each gravelless chamber until full. In an unlikely event of an emergency flood condition, the system will overflow at inlet #1 (elev flow west of walk. All elevations and slopes are shown on C2 of the civil set of plans. EXHIBIT 2 Exhibit 2 is an estimate of contributing roof areas to each storm structure. Sincerely, John C. McDonnell, P.E. President (OFF) 425 744-0916 (CELL) 425 359-2717 (FAX) 425 744-0946