Loading...
06.12.2017 CIVIL REVIEW RESPONSE.pdfOConnell Civil Engineering — 2812 Colby Avenue, Everett, WA 98201 Phone: 206-747-3494 email: ojerry26@yahoo.com June 6, 2017 Jeanie McConnell and Jen Machuga µ� City of Edmonds 121 5"' avenue N Edmonds, WA 98020 JUN 2 2D17 DEVELOPMENT SERVICES RE: Response letter to City review civil engineering comments— dated 03/29 & 03/31 COUNTER pin20110008-weiss short plat Dear Jeanie and Jen: Thank you for your review comments. The following revisions have been made to the civil plans in response to the above review comments: Planning: (Jen's comments relevant to civil plans) 3. revised protective fencing and added callout for ecdc 18.45.050 (on civil plans). 5b. deleted nva fencing. (Jeanie's civil comments) General: 1. revised cost estimate. C1 cover: 1. added postmaster note on c and added callout on C3. (submitted approval document) C2-swppp 1. comment conflicts with planning comment about complying with ecdc 18.45.050 ---so I added orange fencing to the rope barrier to comply with both comments. 2. revised orange fencing C3 -frontage plan/utility 1. revised curbing around cb#2. 2. revised cross section callout. 3. revised eb stubs. 4b. revised cb/storm connection as noted. 5. revised wm/ws callout to show tap and install by City. 6. added striping note per comment. C4 -sound view profile 1. added gas service on profile per comment. 2. updated plan sheet as needed per comment. C6 -traffic control plan 1. revised tcp note per comment. C7 -notes & details 1. added city curb/gutter detail per comment. 2. revised soundview section per comment. Stormwater report 1. combined supplement with full original report into one final report. 2. submitted 2 copies of the revised full final report. Jerry OConnell, P.E. OCE engineering 1403-response4-060617