Loading...
06-005_DeisherSFR-2nd.doc CE ITY OF DMONDS th • 1215 AN•E,WA98020 VENUE ORTH DMONDS P: 425.771.0220 • F: 425.771.0221 • W: www.ci.edmonds.wa.us HONEAXEB DSD: P•E•B EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING February 10, 2006 Larry Deisher PO Box 311 Port Gamble WA 98364 Phone: 425.339.1302 /Fax: 425.604.5628 RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 06-005 TH DEISHER SFR AT 7025 174 STREET SW (SECOND REVIEW) Dear Mr. Deisher, I have reviewed the above building permit application for the Planning Division and it was found that the following information, corrections, or clarifications will need to be addressed before review can continue: Recorded Short Plat Map: 1. Please provide two full size copies of the recorded short plat. Thank you for providing the Auditor’s File Number so I could verify the status online. A condition of short plat (S-04-52) approval is to provide the City Planning Division with two copies of the recorded plat with the recording number written on them, and that the City cannot consider the subdivision to have been completed until this is done. Please resolve this technicality at your earliest convenience. -- I only came across one copy of the recorded plat map with your re-submittal on April 12 (thank you). Would you like me to make a copy of it here (two pages would be $10) so that we have two on file (one for the Clerk’s office and one for your short plat file), or would you like to submit the other copy yourself? Slope: 2. Please label the top of the slope on the site plan. The geotechnical report suggests a buffer from the top of the slope and this measurement needs to be shown. -- Thank you for labeling the top of the slope on the site plan. Page 6 of the Nelson Geotechnical Report (File No. 393604) dated May 26, 2004 states: “The proposed building setback of 35 feet from the top of the steep slope on the western lot could be reduced to 25 feet, if desired, without impacting slope stability.” The current site plan shows the proposed building at, in some places, less than ten feet from the top of the slope (and in one spot, approximately three feet). Because this figure is less than what the Geotechnical Report states is adequate, we would just need to have the Geotechnical Engineer review the current plans (which are different than what they had originally reviewed) and make a statement/recommendation on the safety of the type of foundations proposed and the safety of the project. Last year, the Critical Areas chapter was updated, and the new code references are in Edmonds Community Development Code chapter 23.80 (Geologically Hazardous Areas) and 23.40 (Report Requirements). Please don’t hesitate to contact me if you have any questions about Critical Areas. Reduced Copy: 3. Please submit one reduced sizes copy of the site plan for the file (for archiving/microfilming). Thank you for your cooperation. Please redline plans or submit two sets of revised plans/documents (affected sheets only) with a written response to each of the above items. Please make all submittals to the Development Services Permit Coordinator Monday through Friday, 9am to noon or 1pm to 4pm. If you have any questions, please don’t hesitate to contact me at (425) 771-0220, extension 1778. I look forward to working with you on this project. Sincerely, CITY OF EDMONDS Gina Coccia, Planner