Loading...
06-0682-1.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # 2006-0682 July 13, 2006 Project Name/Address: 812 Cary Contact Person/Address/Fax: Sabina, Mike Norton/425-985-1516, 206-786-3387/ e-mail: Sabina_norton@mckinsey.com, mike.norton@ssamarine.com Reviewer: Jaime HawkinsDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed: 1.Please show the TESC in the Site Plan. Please make sure to include standard detail E1.1, E1.2, and E1.3 2.The existing driveway shall not be used as a Stabilized Construction Entrance. 3.Is the water service line shown in the Site Plan proposed or existing? Please indicate. If this is a proposed water service line and poly is used then a 12-gauge tracer wire shall be taped to the line every ten feet and it shall be grounded at ends, the meter and the house. 4.Please show the limits of all existing easements within this property in the Site Plan, make sure to include recording numbers. 5.The proposed sidesewer show in the site and drainage plan do not coincide. A 6-inch clean-out with locking cast iron lamphole shall be installed at final grade at the easement line. A clean-out shall be provided for each change of 90-degrees of grade or alignment. Please refer to Side Sewer Information handout #E71. 6.Provide a Grading Plan. Make sure to include existing and proposed contour lines. This plan can be combined with the Site and/or Storm Drainage Plans. Please include the bottom of footing elevations. 7.Please show the limits of the existing driveway in the Site Plan. Is there going to be a new driveway? If so, include its surface area in the impervious surface calculation. Included in the attachment is a PDF copy of the Storm Water Engineer’s comments for you to review and/or provide to your Storm Water Engineer. If your Storm Water Engineer has any questions regarding Damon’s, Storm Water Engineer, comments please have him/her contact Damon Roth. DATE FAXED PAGE ____ OF ___ Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED PAGE ____ OF ___