06-074_SoudakovSFR-3rd.doc
CE
ITY OF DMONDS
th
121 5 Avenue North • Edmonds, WA 98020
Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.ci.edmonds.wa.us
DSD: P•E•B
EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING
Plan Review Comments
Albina Soudakova
th
20218 12 Avenue NW
To:
Shoreline WA 98177
Phone: 206.227.5778 / Fax: 206.801.7178
Date: September 6, 2006 (THIRD REVIEW)
Building Permit Application #BLD-20060583
Subject:
nd
Vladislav Soudakov New SFR: 8507 202 Street SW
Dear Oleg,
I have re-reviewed the above building permit application for the Planning Division and it was found that
the following information, corrections, or clarifications will need to be addressed before review can
continue:
Height Calculations:
1. Please revise the height rectangle (and height calculations) to include the
entire building footprint on the site plan. This means including the south bump-out and the north
bump-out in the height rectangle (moving points A & B further north and points C & D further
south) and revising the height calculations accordingly. Please also update the elevations on the
plans to shown the new Average Grade and new Maximum Height.
It looks like you moved the height calculation points on the “Drainage Plan” that you submitted
but the “Site Plan” appears to be different – please update these items on the Site Plan and make
them consistent. If it is the same as what you’re showing on the Drainage Plan, it would
probably be quickest if you came in and redlined the Site Plan. Please also remember to add the
Maximum Elevation, the Average Grade, and the Actual Height on the elevations.
Thank you for your cooperation. Please redline plans or submit three sets of revised plans/documents
(affected sheets only) with a written response to each of the above items. Please make all submittals to
the Development Services Permit Coordinator (JoAnne Zulauf) Monday through Friday, 9am to noon or
1pm to 4pm. If you have any questions, please don’t hesitate to contact me at (425) 771-0220, extension
1778. I look forward to working with you on this project.
Sincerely,
CITY OF EDMONDS
Gina Coccia, Planner