Loading...
06-084 Westgate Chapel Parking lot.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Comments Plan Check : Date: # 06-084 29 Mar 06 th Project Name/Address: Westgate Chapel Parking Lot; 9303 228 St SW Contact Person/Address/Fax: fax/ : Water Adamson : Reviewer: Division:Engineering Lyle Chrisman, Engineering Program Manager The subject application has been reviewed but cannot be completed until the following items have been addressed/corrected. Please resubmit 3 sets of revised drawings to a Development Services Permit Coordinator. General 1. The estimate provided is adequate to determine the engineering inspection fee, however the off-site improvements need to be broken out so the required performance bond can be determined. 2. Provide traffic control plan for work within the City right-of-way. 3. Provide a truck route plan. 4. Indicate the staging area . Sheet C2.03 5. General note #1: Add “current edition” just before Washington State. 6. Site grading note #6: after 7 days add: “ and from Oct 1 to April 1 soil shall be exposed a maximum of 2 days” 7. Add all 17 ESC points from Chapter 18.30.050 of the Edmonds Community Development Code verbatim, to the drawing. 8. TESC note #4 is a duplicate of note #4 in the Site grading notes. 9. Construction Sequencing: a) Change note #1 to read: “ Call the Engineering inspection line (425-771-0220 ext 1326) to set up a pre construction meeting and call 24 hours in advance for all inspections. b) Add a note between note 3 and 4- “ Review ESC notes. c) Between note 6 and 7 add a note on dust control. __________________(Attach fax transmittal) DATE FAXED PAGE ____ OF ___ C:\\Users\\cockrum\\AppData\\Local\\Temp\\06-084 Westgate Chapel Parking lot.doc_154933\\06-084 Westgate Chapel Parking lot.doc Sheet 3.01 10. Show the painted centerline. rd 11. Indicate the distance the curb line from the painted centerline ( 12.0’ to the face of the curb) on 93 Ave and on th 228 St SW. 12. Change entrance layout to reflect a commercial type entrance (City detail E 2.27.1) and also how the high traffic load gutter. 13. How will ADS pipe connect to the concrete pipe? Change the ads pipe to concrete. rdth 14. Will water collect at or on the curb ramp at 93 and 228? 15. Please provide a knockout on east side of cb #16 at the same invert as pipe to the west. FYI: We have a storm rd project designed for 93 Pl and our plans coincidently show a cb in the same location as your cb 16. In our design, that cb will connect to a type II cb in the street (at your sta 31+79), which will connect to the existing 72” at your station 30+55. The existing 18” storm pipe that crosses the street to the north will be redirected along the east side of the road, into a cb directly across from cb 16 and connect to the proposed type II cb. Sheet C3.02 16. Place a note on the drawing to add a 4” ¼ turn storz (fitting) adapter to the existing fire hydrant. thth 17. Show existing curb line and curb ramp at the n.w. corner of 95 and 228. th 18. Add a crosswalk between the N.W. and N.E. curb ramps on 95 Pl. thth 19. Move the N.E. curb ramp closer to 228 so the curb ramp lines up with the ramp and the S.E. corner on 95. 20. Add a crosswalk between the N.E. and S.E. curb ramps. thth 21. Add a stop bar to the drawing on 228 at 95. 22. Crosswalks and stop bars shall be thermoplastic per City standard detail. thth 23. The existing 72” sdmh at the intersection of 95 and 228 shall be core drilled for the installation of the 12” pipe from cb 13. th FYI: during the 96 Ave walkway project, we had to reroute the water main under the 18” storm line 24. (which is ribbed pvc) at your cb1, using 45* bends. Thrust blocks were poured at the bends . 25. Add a note to remove the 18” storm pipe going east from the exist cb at cb#1. 26. Is the location of the existing cb, shown under and behind your cb#1, represent that of the new cb installed under the City’s project, or is it the old one? 27. The face of curb shall be 12.0’ from the painted centerline. 28. Place a note on the drawing that all cb’s shall have vaned grates unless otherwise indicated. 29. Depth of water main should be investigated where it crosses the storm at cb 14 and if in conflict, indicate on the drawing what action will be required and not wait until the project is under construction. th 30. Indicate the i.e.(at the exist 72” sdmh) of the new 18” storm pipe from cb #13 on the 228 St profile. th 31. The existing 18” storm pipe on 228 St, installed under project E2BA is ribbed pvc and not ADS. 32. Remove all old driveway approaches from the drawing ,if removed with bldg demo’s, or indicate to remove them if they weren’t. __________________(Attach fax transmittal) DATE FAXED PAGE ____ OF ___ C:\\Users\\cockrum\\AppData\\Local\\Temp\\06-084 Westgate Chapel Parking lot.doc_154933\\06-084 Westgate Chapel Parking lot.doc Sheet C3.03 33. Indicate the distance from painted centerline to face of curb on the drawing. 34. Remove all old driveway approaches from the drawing ,if removed with bldg demo’s, or indicate to remove them if they weren’t th 35. Remove all the 12” rcp from cb #12 to 228 St. th 36. Show the existing curb/gutter and sidewalk on the west side of 95 Pl. 37. Is there a conflict between existing water main and the new 12” pipe between cb 11 and 12? 38. Based on inverts on the proposed storm pipe between cb 11 and 12, there is only 0.7’ of cover over the pipe. 39. Show the water main location on the profile. Sheet C3.04 40. Remove all existing structures etc that were removed with the current demo and grading plan. 41. Show current grades, reflecting the grading under the current permit, and new proposed grades. 42. Indicate the dimensions of the rip rap area and state the size of the rip rap. 43. What is the size of the perf pipe adjacent to the detention pipe? 44. Rockeries cannot be used to support a fill. Once retaining material has been determined, provide top and toe elevations. 45. What is the size of the out flow pipe from the detention system? 46. Cannot determine slope direction of perf pipe, on north side of lot, between c.o. with ie of 348 and 347.61. 47. Are therer any barrier free stalls? 48. Add curbing between parking stall and pedestrian walkway. 49. Add diagonal white stripes across pedestrian walkway within the parking lot to prevent vehicular parking. 50. What is the slope of the parking lot entrance? 51. The parking lot entrance shall be commercial type with radiused curbs and high capacity gutter. th 52. The existing pavement shown on 228 St to remain, shall be removed to the centerline and repaved not only to match the adjacent but also to insure proper cross slope of travel lane. th 53. Add advanced pedestrian crossing signs on 228 St SW per MUTCD. 54. Pavement legend: Traffic areas within the City right-of-way shall have 2” acp, 2” 5/8” CSTC and 4” 1-1/4” CSBC. No substitution of 5/8” for 1-1/4” will be allowed in City right-of-way. thth 55. Current trench backfill around existing 72” cb at the intersection of 95 and 228 St is ¾ sack cdf mix. Backfill in the intersection shall be maximum ¾ sack cdf mix. 56. What is the slope of the pedestrian walkway? __________________(Attach fax transmittal) DATE FAXED PAGE ____ OF ___ C:\\Users\\cockrum\\AppData\\Local\\Temp\\06-084 Westgate Chapel Parking lot.doc_154933\\06-084 Westgate Chapel Parking lot.doc Sheet C3.06 57. Provide cross section of detention and per pipe system. 58. Label the sizes of the drainage pipes into the bio-swale. 59. Provide and enlarged detail showing location of outfall pipes into the rip rap and location above the flow line of the ditch. 60. How can the perf pipe along the detention system drain to the bio-swale if the perf holes are in the 4 and 8 position and there is no slope? 61. Control structure a) note 8: remove “omit plate if only for pollution control”. b) Note 9 and 10: there appears to be a conflict between the notes. Note 9 refers to an aluminum sheer gate and note 10 allows the use of hdpe retrictor tee. How can an aluminum sheer gate work with hdpe pipe? c) Note 10: Provide a copy of dwg 5-250 for review and approval of use. Sheet C3.07 62. Plan view indicates a 4’ ditch wide flow lilne. 63. Outflow pipe from detention system should be located above the flow line of the ditch and drain onto rip rap. 64. Show rip rap location on the drawing. 65. What is the slope above and below the retaining structure in the ditch? Sheet C3.08 66. Pipe Specifications: a) Add “ City of Edmonds” between WSDOT/APWA specifications and with, in the forth line of the general note. b) Note 1: submit a copy of the drawing of B-17. c) Materials allowed for storm pipe: CMP be it galvanized steel or cmp asphalt coated is not allowed in the City right-of-way. d) Materials allowed for storm pipe systems: there is no note #4. 67. Section A: add a note that the existing pavement shall be thoroughly cleaned and tacked prior to placement of acp. 68. Sections B and C: Indicate the painted centerline. 69. Detail 1: Place a cap on the storm clean out pipe. Label the sleeve around the storm pipe 12” pvc. Weld SD on the locking lid so it will not be mistaken for a sanitary sewer clean out. Also place a locking lamphole cover over the clean out in non paved areas and label the lid accordingly. 70. Detail 2: add “ all around the trench” to the note on filter fabric. Sheet C3.09 71. Replace the details with the most current details. Our details are on the web site in both acad and pdf formats. We have replaced the concrete extruded curbing with concrete curb and gutter on our asphalt walkway detail. __________________(Attach fax transmittal) DATE FAXED PAGE ____ OF ___ C:\\Users\\cockrum\\AppData\\Local\\Temp\\06-084 Westgate Chapel Parking lot.doc_154933\\06-084 Westgate Chapel Parking lot.doc Storm Drainage report 72. Comments from the Storm Engineer will be forth coming. Landscape Plans 73. The location of the plants and trees along the north side of the site appear to conflict with the depth of perf pipe. How can the plants be installed on the narrow slope between the parking lot and property line? 74. Show irrigation lines, water meter and backflow preventer on the drawing. The meter shall be located on the right- of-way side at the property line with the backflow preventer on private property. __________________(Attach fax transmittal) DATE FAXED PAGE ____ OF ___ C:\\Users\\cockrum\\AppData\\Local\\Temp\\06-084 Westgate Chapel Parking lot.doc_154933\\06-084 Westgate Chapel Parking lot.doc