06-0940 Aegis 21500 72nd Av CORRECTIONS.doc
MEMORANDUM
Date:October 23, 2006
To:Development Services Lead Marie Harrison
From:John Westfall, Fire Marshal
nd
Subject:BLD20060940 Aegis Living Boarding Home 21500 72 Ave W.
10/15/06 REV
The functional program and plans were reviewed under the 2003 International Codes with WA
State amendments and the Edmonds Community Development Code.
1) Sheet SITE PLAN and L-1 Callout existing location of generator and fuel type.
2) Sheet A1.01 FIRE DEPARTMENT NOTES: #7 typo
3) Sheet A1.01 FIRE DEPARTMENT NOTES: Correct #8 to read:
SMOKE-ACTIVATED FIRE DOORS INTERCONNECTED TO THE FIRE ALARM SYSTEM
SHALL BE SELF-CLOSING IN ACCORDANCE WITH NFPA 80.
4) Sheet A1.01 EVACUATION CAPABILITY
Add back WAC EVAC CAPABILITY definitions and restrictions for sleeping room locations
(IBC 419.5 and 419.6) as record of LC limitations for owner.
5) Sheet A1.01 FIRE DEPARTMENT NOTES:
FIRE PREVENTION PROGRAM SUPERINTENDENT IS ____________ (identify by name,
typ. GC or rep) WHO WILL ADDRESS THE IMPAIRMENT OF SPRINKLER SYSTEMS,
FIRE ALARM DETECTION SYSTEMS, SYSTEM CONTROL LOCATIONS, AFTER HOURS
CONTACT _____________ (phone #) AND PROVIDE FIRST RESPONSE INFORMATION
IN CASE OF FIRE OR OTHER EMERGENCY DURING CONSTRUCTION.
6) Sheet A1.01 Fire permits for DEFERRED SUBMITTALs include
a. Fire Sprinkler Permit (NFPA 13)
b. Fire Alarm
c. FIRE PROTECTION FOOTPRINT
d. FIRE SAFETY AND EVACUATION PLAN
7) Sheets A1.1a-c, A2.1a-c, A3.1a-c CONSTRUCTION NOTES:
PROVIDE EMERGENCY ILLUMINATION THROUGHOUT CORRIDOR AND COMMON
AREAS
City of Edmonds Office of Fire Marshal
8) Sheets A1.1a, A1.2, A2.1a, A2.2, A3.1a, A3.2
-TYPICAL SEE FIRE ALARM PLANS FOR CORRECT CORRIDOR AND COMMON AREA
DETECTOR SPACING. UNIT SMOKE ALARMS ARE NOT CONNECTED TO FIRE ALARM
SYSTEM.
9) Sheets A1.1a & A2.1a
TYPE I HOOD SUPPRESSION SYSTEMS IN #110, #113 & #236 SHALL BE UL-300
COMPLIANT (EDMONDS COMMUNITY DEVELOPMENT CODE).
10) Sheets A1.1a, A2.1a, A3.1a
Illuminated exit signs are not required (NR) mid corridor along the South or East wings.
11) Sheet A1.1a & A1.2
Delete two exit signs installed against exit flow in Corridor 128 on LOBBY side of new doors.
12) Sheet A1.1a & A1.2
Add exit sign in PARLOR / CONCIERGE at main exit.
13) Sheets A1.4a, A2.4a, A3.4a FINISH NOTES
INTERIOR WALL AND CEILING FINISHES IN A SPRINKLERED MUST MEET CLASS C
FLAME SPREAD & SMOKE DEVELOPED INDEXES IN ACCORDANCE WITH IBC TABLE
803.5.
14) Sheet A2.1a Delete NW exit sign fixture at non-required exit in DINING 235.
15) Sheet A2.1a Relocate exit sign directing exit flow at bottom of up-STAIR in CORRIDOR
228.
16) Sheet A2.1a Relocate exit sign to down-STAIR door in CORRIDOR 228.
17) Sheet A2.2 NOTE: SEE SHEET A2.1a FOR EXIT SIGN LOCATIONS.
18) Sheet A3.1a ADD exit sign north end of CORRIDOR 323.
19) Sheet A3.1a Relocate exit sign to down-STAIR door in CORRIDOR 323.
20) Sheet A3.2 NOTE: SEE SHEET A3.1a FOR EXIT SIGN LOCATIONS.
21) Sheet D-4 Callout smoke alarm placement on suite plans.
22) NOTE: Oxygen gas or liquid storage in excess of Max Allowable Quantities must be
approved.
daphne@perraultinteriors.com
Cc: Perrault Interiors LLC
Millenium Construction mike@millbuild.com
WA DOH richard.swanson@doh.wa.gov
Assistant Building Official Ann Bullis
2